BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling and renovation of a military facility in Wichita Falls, Texas. Completed plans call for the remodel of a military facility.

An intense cold weather event in mid-February caused extensive damage to multiple facilities on Altus AFB. The sub-zero temperatures over ten days greatly exceeded the historical weather patterns from the area and caused domestic water and fire protection piping to rupture. The resultant leaking water caused damage to Fire Detection, Fire Suppression, Plumbing, and Water Delivery Systems. Hangar 518 is a large aircraft hangar with high ceilings and large doors to facilitate work on KC-135, C-17 and KC-46 aircraft. The magnitude of this construction project is between $1,000,000 and $5,000,000. SCOPE AND DESCRIPTION OF WORK: A. Demolition: 1. Remove damaged sprinkler heads and associated piping. 2. Remove damaged main drain valves. 3. Remove damaged Victaulic fittings and pipe. 4. Remove damaged tempered water line to eye-wash stations. 5. Remove damaged pipes and fittings on domestic water system. 6. Remove damaged pipe insulation. 7. Demo water damaged Fire Alarm Control Panel electronic components and fire detection system components. Contractor to inspect and verify condition of all components in panels shown on plans. B. New Work: 1. Replace damaged sprinkler heads and associated piping. 2. Replace damaged main drain valves. 3. Replace damaged Victaulic fittings and pipe. 4. Replace damaged tempered water lines to eye-wash stations. Use copper tubing and fittings. 5. Repair multiple leaks on domestic water lines or replace damage pipes and fittings. 6. Replace damaged pipe insulation at multiple locations. 7. Replace water damaged Fire Alarm Control Panel electronic components and fire detection system components shown on plans. New components to be compatible with existing components and devices. C. PROJECT REQUIREMENTS: A. The Contractor shall coordinate the equipment/material lay down area before the start of the construction of the project. B. The facility may be occupied 24/7 requiring close coordination with occupants. C. Install floor and building dust partitions to protect occupants and facility at all times. D. The contractor shall clean the project and surrounding areas at the end of each workday

Post-Bid

Military

$5,000,000.00

Public - Federal

Remodeling, Renovation

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
28
Bidding Soon
718
All Active Projects
254
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 13, 2022

February 14, 2022

August 17, 2022

img_map_placeholder

To Be Determined, Wichita Falls, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.