Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 21, 2021

October 21, 2021

November 15, 2021

Award

Fire / Police

$138,742.00

Public - City

Renovation

img_map_placeholder

To Be Determined, Reading, PA

Subscribe to View Full Documents

Renovation of a fire / police facility in Reading, Pennsylvania. Completed plans call for the renovation of a fire / police facility.

SOUTHWEST FIRE STATION IMPROVEMENTS There will be a mandatory prebid meeting for this project. Each proposal shall be accompanied by bid surety in the amount of ten percent (10%) of the proposal. A certified check or bid bond will be accepted. Attention is called to the fact that Davis-Bacon Act prevailing wage rates must be paid by the contractor and that employees shall not be discriminated against because of race, color, age, religion, sex or national origin. The City of Reading reserves the right to accept or reject any and all bids, and to accept or reject any part of a bid, as may be in the public interest. Funding for this project is from the City of Reading's Community Development Block Grant. The successful bidder, upon award of contract, shall furnish at the time of execution of the same, a Maintenance Bond, Payment Bond, and Performance Bond by a surety company acceptable to the City of Reading, in an amount equal to ONE HUNDRED PERCENT (100%) of the contract to guarantee satisfactory performance. All bonds are subject to approval by the City Solicitor. The Work included in this Contract consists of furnishing all plant, new materials, equipment, supplies, labor, transportation, fuel and power and performing all Work as required by the Contract, in strict accordance with the Specifications, Schedules and Drawings, and Pennsylvania Department of Transportation Publication 408 specifications, latest edition, all of which are made a part hereof; and including such detail Drawings as may be furnished by the ENGINEER from time to time during the construction in interpretation of said Drawings. PennDOT Publication 408 shall be adhered to regarding construction methods and materials. Contract administration and measurement and payment basis shall be as specified in these Contract Documents. The Work shall be complete and all Work, materials, and services not expressly called for in the Specifications, or specially indicated on the Drawings, which may be necessary for complete and proper construction to carry out the Contract in good faith, shall be performed, furnished and installed by the CONTRACTOR at no additional cost to the OWNER. The Work shall be executed in the best and most workmanlike manner by qualified, careful and experienced workers. Requests for clarification are due Monday, September 13, 2021 12:00:00 PM [(UTC-05:00) Eastern Time (US & Canada)].

64 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Starting At

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Don't miss Bidding Projects!

Within 75 Miles of this Project:
581
Active Projects
343
Bidding Soon

Related Projects


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.