BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a detention facility in Paynes Creek, California. Working plans call for the renovation of a detention facility.

**As of 12/06/2021 the project was cancelled due to lack of budget** **As of 10/18/2021 The project is scheduled to begin around the end of December 2021. Project comprises labor, material and services necessary for: Major components of Project Work scope includes but may not be limited to the following: Kitchen Site: Demolition of existing paving, sidewalks, curbs, utility laterals, etc. Grading, earthwork & trenching for utilities, temporary fence construction & removal. Concrete, A.C. paving & base. Water, sewer, gas, power & communication service to building. Emergency electrical generator for new building. Construct about 4,800 square foot new kitchen & dining pre-engineered metal building with CMU wainscot walls & concrete floor slab & foundations including equipment, finishes, furniture, etc. Trash enclosure & pump house. Fire alarm, fire sprinkler & public address systems. Fire Tank Site: Construct 180,000 gallon on grade welded steel fire tank with level controls & appurtenances including clear & grub site, grading & earthwork. Provide water piping, electrical & communication service between the kitchen site & tank site. Provide gravel access road & chain link fence, gates & related work. License required to bid the project: B. Refer to Document 00 22 00, Supplementary Instructions to Bidders, Subparagraph 2.1.3 regarding performance of work of a Fire Protection specialty contractor license classification C-16. Successful bidder shall furnish payment and performance bonds, each in the amount of 100 percent of the Contract price. States estimated cost: $9,099,500.00 The term of this project is 426 calendar days. The States Project Director is Suhas Karke at (916) 539-0030.

Final Planning

Jails / Prisons

$10,134,000.00

Public - State/Provincial

Renovation

134

40

2

3

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
7
Bidding Soon
86
All Active Projects
43
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 12, 2021

June 6, 2022

img_map_placeholder

30500 Plum Creek Rd, Paynes Creek, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.