BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 12, 2026 at 7:00 PM

Updated January 13, 2026

Site work for a transportation facility in North Miami Beach, Florida. Design plans call for site work for a transportation facility.

The Northeast Corridor marks the first segment of the 85-mile Coastal Link commuter rail, designed to seamlessly connect Miami-Dade with Broward and Palm Beach counties. This 13.5-mile project will establish a new rapid transit route from Miami Central Station in downtown Miami to West Aventura Station, utilizing the existing railroad corridor shared with Brightline and freight services. The goal is to provide residents, businesses, and visitors with a reliable and efficient transportation option. The project will utilize the existing Brightline Miami Central and West Aventura stations, while also adding five new stations in Wynwood, Design District, Little Haiti, North Miami Beach, and FIU North Campus. Trains will operate every 30 minutes during peak hours and every 60 minutes during off-peak times and weekends. In addition, a new vehicle maintenance and storage facility is being built at the Florida Department of Transportation’s Hialeah Yard. The Northeast Corridor will create a new route from Downtown Miami to Aventura. The municipalities within the corridor are Miami, Miami Shores, El Portal, Biscayne Park, North Miami, North Miami Beach and Aventura. The proposed stations will be located at: MiamiCentral (Existing - 600 NW 1st Ave., Miami, FL 33136) Wynwood (New Station - NE 27th Street) Design District (New Station - NE 39th Street) Little Haiti (New Station - NE 61st Street) North Miami Beach (New Station - NE 125th Street) FIU North Campus (New Station - NE 151st Street) West Aventura (Existing - 19796 W Dixie Hwy, Miami, FL 33180) As of January 12, 2026, this project is in the design phase. Construction is expected to begin in early 2026 and be in service by 2032.

Design

Transportation Terminals

$927,300,000.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
0
Bidding Soon
1,013
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

Project location map

NE 151st St, North Miami Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.