BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 21, 2022 at 7:00 PM

Updated September 19, 2024

Demolition, site work, new construction, renovation and addition to a mixed-use development in Thomasville, Georgia. Design plans call for the addition of a educational facility; for the demolition of a educational facility; for the construction of a educational facility; for the renovation of a educational facility; and for site work for a playground / park / athletic field.

As of January 21, 2022, a construction manager at risk has been selected for the project. A firm timeline for construction has not been disclosed. *The closed solicitation has been included below for reference: The Thomasville City Schools (hereinafter referred to as TCS) is hereby seeking proposals from construction firms to provide services through the Construction Management at Risk delivery method for the Thomasville City Schools - 6-12 School Renovation & Addition located in Thomasville, GA which includes a renovation to the existing school buildings, additions to existing school buildings, demolition of existing school buildings, new athletic fields, and a new track. Also included will be renovations of the Thomasville City Schools three elementary schools. The proposed project consists of a multi-phase construction process that will be located on the occupied campus of MacIntyre Park Middle School. The first phase of new construction will consist of a new 6-12 gymnasium, two-story academic wing, football field house, and athletic fields. The second phase of construction will consist of the demolition of the existing middle school gymnasium, a large-scale renovation of the existing "Scholars Building", and the new construction of a CTAE/Fine arts/Cafeteria/Kitchen building. The final phase of construction will consist of the demolition of the existing middle school kitchen/cafeteria/annex building, the demolition of the existing high school facility, and final site work which will include a new track and field. This project will require heavy construction coordination as students will be relocated to swing facilities throughout the duration. The final facility will be the Thomasville City Schools 6-12 Campus and athletic complex. The 6-12 campus will be on the existing MacIntyre Park Middle School property located at 117 Glenwood Dr, Thomasville, GA 31792 and the athletic complex will be on the adjacent existing high school property located at 315 S Hansell St, Thomasville, GA 31792.

Design

Educational

$57,000,000.00

Public - City

Addition, Demolition, New Construction, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
1
Bidding Soon
273
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2021

April 4, 2022

Project location map

Multiple Locations, Thomasville, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.