BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Clearfield, Utah. Completed plans call for site work for a road / highway; and for paving for a road / highway.

This Project Requires Using the Electronic Certified Payroll Program. See Attachment to Notice to Contractors. This Is a P+t (Price + Time) Project. Wage Rates: Apply Engineer's Estimate: Greater Than $1.5m but Less Than or Equal to $3m (Qualified Health Insurance Required) Project Location: US-89; Victory Road to Davis Co. Line The principal items of work are as follows (for all items of work see attachment): 1/2 Inch HMA PG 64-34 (Spray Paver Applied) Open Graded Surface Course (Spray Paver Applied) Rotomilling - 3 Inch The project is to be completed: to be determined by competitive bid. Each bidder must submit an electronic bid bond from an approved surety company using UDOT's Electronic Bid System (EBS); or in lieu thereof, cash, certified check, or cashier's check for not less than 5% of the total amount of the bid, made payable to the Utah Department of Transportation, showing evidence of good faith and a guarantee that if awarded the contract, the bidder will execute the contract and furnish the contract bonds as required. The right to reject any or all bids is reserved. Additional information may be secured at the office of the Utah Department of Transportation, (801) 965-4346 UTOT - US-89; Victory Road to Davis Co. Line Rehabilitation High Volume *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Time charges begin based on the following: 1. The Contractor notifies the Engineer in writing of the desired start date. 2. The start date must be on or after the Early Start Date and before the Late Start Date as defined below: a. Early Start Date - May 16, 2022 b. Late Start Date - July 11, 2022 3. If the Contractor fails to notify the Engineer 14 calendar days prior to the Late Start Date, then contract time begins on the Late Start Date.

Award

Roads / Highways

$2,577,084.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
33
Bidding Soon
535
All Active Projects
199
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2021

May 16, 2022

img_map_placeholder

US-89, Clearfield, UT


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.