Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 11, 2021 at 7:00 PM
Updated November 15, 2023
Site work, paving and renovation of a mixed-use development in Milwaukee, Wisconsin. Completed plans call for the renovation of a playground / park / athletic field; for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; and sidewalk / parking lot.
A site visit by each bidder is highly recommended prior to submitting the bid for this work. In general the work consists of: Replacement of tensioned fabric covers for an existing tensioned fabric building and miscellaneous general construction alterations to items in the exterior walls including exhaust louvers, hollow metal doors, frames, hardware and concrete curbs. All bidders are encouraged to attend this non-mandatory Pre-Bid Conference and no separate tours will be conducted. Representatives from the A/E's office will be available to take questions for answer in addendum. Prospective bidders are asked to familiarize themselves with the project documents and requirements prior to the conference and walkthrough. Contact person: Nathan Elliott, (608) 733-6250 All changes shall be documented by an electronic Change Order to adjust the contract amount. Changes may be either an add or a deduct. Changes may be initiated either by an electronic Field Order from the Owner's Project Representative prior to determination of the final cost, or by an electronic Change Order that is based upon the final agreed upon total cost. Except in cases of emergencies, no change in the Work shall be made without the prior approval of the Owner. Field Orders or other proposed changes in the Work can only be authorized by the Owner's Project Representative. When a change is initiated, the Contractor shall provide the Owner's Project Representative with an electronic proposal within 10 working days, unless both parties agree upon a different time period. The Contractor's proposal shall state the proposed cost of the change, with appropriate cost breakdown, any effect on the contract completion date, and pertinent information concerning the circumstances and scope of the change.
Under Construction
Playgrounds / Parks / Athletic Fields
$231,000.00
Public - State/Provincial
Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 14, 2021
November 10, 2021
640 S 84th St, Milwaukee, WI
Related To This Project
Milwaukee, WI
Bid Date: Sep 02 2021
Milwaukee, WI
Bid Date: May 20 2021
Milwaukee, WI
Bid Date: May 18 2021
Milwaukee, WI
Bid Date: Feb 16 2021
Milwaukee, WI
Bid Date: Aug 04 2020
Milwaukee, WI
Bid Date: Aug 11 2020
Milwaukee, WI
Bid Date: Apr 28 2020
Milwaukee, WI
Bid Date: Mar 11 2020
Milwaukee, WI
Bid Date: Oct 27 2021
Milwaukee, WI
Bid Date: Nov 30 2021
Milwaukee, WI
--
Milwaukee, WI
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
