Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 31, 2024 at 7:00 PM
Updated April 9, 2025
Renovation of a detention facility in East Moline, Illinois. Completed plans call for the renovation of a detention facility.
The project consists of re-roofing Housing Unit 3 (C3007) and Housing Unit 4 (C3008) and the demolition / installation of multiple new air handling units in 5 buildings including All Faiths Chapel (C3014), the Education Building (3034), Housing Unit 3 (C3007), Housing Unit 4 (C3008), and the Vocational building (C3041). Cost range: under $7,000,000. Earlier solicitation has been included below for reference: The scope of work provides for replacing approximately 42,000 square feet of both steep and flat roofing on Work Camp 1/Housing Unit 3 (C3007) which is a 46,000 square foot, 3-story building established in 1940 and Work Camp 2/Housing Unit 4 (C3008) which is a 46,000 square foot, 3-story building, established in 1935. The work includes architectural style shingles, underlayment, metal edging, flashings, gutters and downspouts, as well as a new membrane, insulation, drip edge metal and all necessary accessories. PROFESSIONAL LIABILITY INSURANCE REQUIRED: $2,000,000 PROJECT FEE CLASSIFICATION: Group II R The procurement of design services by the Capital Development Board (CDB) is governed by the Illinois Compiled Statutes; Illinois Procurement Code, 30 ILCS 500 and Architectural, Engineering and Land Surveying Qualifications Based Selection Act, 30 ILCS 535. Question Deadline Dec 06, 2023 Mold has been confirmed throughout the attic spaces on the underside of the wood roof sheathing and wood framing. Remediation is required at mold impacted wood sheathing and framing in the Unit 3 and Unit 4 attics. An asbestos assessment has confirmed asbestos pipe fitting insulation is present in the fan rooms in a deteriorated condition. Additionally, asbestos debris has been confirmed present in the Unit 3 North Fan Room. Repair/remove deteriorated pipe fitting insulation, as well as clean and remove asbestos debris from the Unit 3 North Fan Room. The scope of work also provides for replacing the steam absorption chillers, cooling towers, pumps, air handling units and control systems in the following buildings at the correctional center: Campbell Cottage (C3010), All Faiths Chapel (C3014), and the Education Building (3034), which will impact the systems at Work Camp 1/Housing Unit 3 (C3007), Work Camp 2/Housing Unit 4 (C3008), and the Vocational Building (C3041). The exhaust system currently serving the shower/toilet rooms in both Unit 3 and Unit 4 is no longer operating as intended. A fully engineered replacement upgrade will be required to resolve the exhaust conditions. The scope of work also provides for replacement of associated branch ducts. SINGLE PRIME (General Trade): 18% MBE, 3% WBE, 2% VBE/PBE
Bid Results
Jails / Prisons
$10,669,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 12, 2023
February 12, 2024
100 Hillcrest Rd, East Moline, IL
Related To This Project
East Moline, IL
Bid Date: Jun 13 2023
East Moline, IL
Bid Date: Jan 17 2023
East Moline, IL
Bid Date: Jan 10 2023
East Moline, IL
Bid Date: Feb 08 2023
East Moline, IL
Bid Date: Feb 07 2023
East Moline, IL
Bid Date: Mar 01 2023
East Moline, IL
Bid Date: Mar 07 2023
East Moline, IL
Bid Date: Mar 02 2023
East Moline, IL
--
East Moline, IL
Bid Date: Aug 10 2022
East Moline, IL
Bid Date: Feb 26 2021
East Moline, IL
Bid Date: Jul 26 2022
East Moline, IL
Bid Date: Jun 14 2022
East Moline, IL
Bid Date: Aug 08 2023
East Moline, IL
Bid Date: Jun 07 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
