BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 31, 2024 at 7:00 PM

Updated April 9, 2025

Renovation of a detention facility in East Moline, Illinois. Completed plans call for the renovation of a detention facility.

The project consists of re-roofing Housing Unit 3 (C3007) and Housing Unit 4 (C3008) and the demolition / installation of multiple new air handling units in 5 buildings including All Faiths Chapel (C3014), the Education Building (3034), Housing Unit 3 (C3007), Housing Unit 4 (C3008), and the Vocational building (C3041). Cost range: under $7,000,000. Earlier solicitation has been included below for reference: The scope of work provides for replacing approximately 42,000 square feet of both steep and flat roofing on Work Camp 1/Housing Unit 3 (C3007) which is a 46,000 square foot, 3-story building established in 1940 and Work Camp 2/Housing Unit 4 (C3008) which is a 46,000 square foot, 3-story building, established in 1935. The work includes architectural style shingles, underlayment, metal edging, flashings, gutters and downspouts, as well as a new membrane, insulation, drip edge metal and all necessary accessories. PROFESSIONAL LIABILITY INSURANCE REQUIRED: $2,000,000 PROJECT FEE CLASSIFICATION: Group II R The procurement of design services by the Capital Development Board (CDB) is governed by the Illinois Compiled Statutes; Illinois Procurement Code, 30 ILCS 500 and Architectural, Engineering and Land Surveying Qualifications Based Selection Act, 30 ILCS 535. Question Deadline Dec 06, 2023 Mold has been confirmed throughout the attic spaces on the underside of the wood roof sheathing and wood framing. Remediation is required at mold impacted wood sheathing and framing in the Unit 3 and Unit 4 attics. An asbestos assessment has confirmed asbestos pipe fitting insulation is present in the fan rooms in a deteriorated condition. Additionally, asbestos debris has been confirmed present in the Unit 3 North Fan Room. Repair/remove deteriorated pipe fitting insulation, as well as clean and remove asbestos debris from the Unit 3 North Fan Room. The scope of work also provides for replacing the steam absorption chillers, cooling towers, pumps, air handling units and control systems in the following buildings at the correctional center: Campbell Cottage (C3010), All Faiths Chapel (C3014), and the Education Building (3034), which will impact the systems at Work Camp 1/Housing Unit 3 (C3007), Work Camp 2/Housing Unit 4 (C3008), and the Vocational Building (C3041). The exhaust system currently serving the shower/toilet rooms in both Unit 3 and Unit 4 is no longer operating as intended. A fully engineered replacement upgrade will be required to resolve the exhaust conditions. The scope of work also provides for replacement of associated branch ducts. SINGLE PRIME (General Trade): 18% MBE, 3% WBE, 2% VBE/PBE

Bid Results

Jails / Prisons

$10,669,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
99
Bidding Soon
1,312
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2023

February 12, 2024

Project location map

100 Hillcrest Rd, East Moline, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.