BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a water / sewer project in Rhome, Texas. Working plans call for site work for a water / sewer project.

As of December 28, 2021. The project has been cancelled and no other information has been determined at this time. State funding has been authorized by Title 7, Chapter 201, Agriculture Code of Texas, and Title 31, Part 17, Chapter 529, Texas Administrative Code for this project. Site No. 43 is a single purpose flood retarding structure that was designed and constructed as a low hazard dam in 1981 on Blue Creek. The site is approx. 0.5 miles north of Aurora, Texas and is situated about 1.6 miles west of U.S. Hwy. 81. Upgrades to the existing structure include maintaining the existing principal spillway crest and normal pool elevation; adding additional rock riprap on the upstream slope; raising the embankment by 3.5 feet with compacted fill to an elevation of 784.0 feet, flattening the downstream slope to 3H:1V; extending the embankment through the existing earthen auxiliary spillway; constructing a roller compacted concrete auxiliary spillway over the embankment along the existing principal spillway alignment with a stilling basin on the downstream end; grouting portions of the existing principal spillway conduit in-place and removing the existing riser; and installing a new principal spillway consisting of a 48-inch conduit and covered baffle inlet riser offset to the right of the existing alignment. Performance time for completion of this contract is 538 calendar days, federal holidays and weather days not included. Estimated magnitude of work is between $5 million – $10 million. The solicitation will post on CIVCAST on/about September 23, 2021. This project is sponsored by the Wise County Water Control Improvement District No. 1, Wise County Commissioners Court, Wise Soil and Water Conservations District, and in cooperation with the Texas State Soil and Water Conservation Board. Site No. 43 is a single purpose flood retarding structure that was designed and constructed as a low hazard dam in 1981 on Blue Creek. The site is approx. 0.5 miles north of Aurora, Texas and is situated about 1.6 miles west of U.S. Hwy. 81. Upgrades to the existing structure include maintaining the existing principal spillway crest and normal pool elevation; adding additional rock riprap on the upstream slope; raising the embankment by 3.5 feet with compacted fill to an elevation of 784.0 feet, flattening the downstream slope to 3H:1V; extending the embankment through the existing earthen auxiliary spillway; constructing a roller compacted concrete auxiliary spillway over the embankment along the existing principal spillway alignment with a stilling basin on the downstream end; grouting portions of the existing principal spillway conduit in-place and removing the existing riser; and installing a new principal spillway consisting of a 48-inch conduit and covered baffle inlet riser offset to the right of the existing alignment. Performance time for completion of this contract is 307 calendar days, federal holidays and weather days not included. Estimated magnitude of work is between $5 million - $10 million. The deadline to ask questions is 10/14/2021 4:00 PM CST This project is sponsored by the Wise County Water Control Improvement District No. 1, Wise County Commissioners Court, Wise Soil and Water Conservations District, and in cooperation with the Texas State Soil and Water Conservation Board. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. LOCATION: Big Sandy Creek, Site No. 43 islocation approximately 0.5 miles northeast of Aurora, Texasin Wise County Project No.: TSW19609, WCWCID1-S-21-BS43

Final Planning

Water / Sewer

$9,843,175.00

Public - County

Site Work

Subscribe For Documents

99 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
76
Bidding Soon
3,513
All Active Projects
1,290
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.