Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 5, 2021 at 8:00 PM
Updated August 7, 2025
Site work and paving for a mixed-use development in College Park, Maryland. Completed plans call for site work for a playground / park / athletic field; for paving for a road / highway; road / highway; and water / sewer project.
The City of College Park ("the City") requests bid proposals from licensed contractors to construct the Odessa Park Playground project ("Project") located at the east terminus of Odessa Road, in the Sunnyside neighborhood of College Park on a parcel donated to the City. The purpose of the project is to construct a playground and access walkway for the existing community. The purpose of the project is to construct a playground and access walkway for the existing community. All facilities shall be constructed as specified in the plans, drawings, technical specifications, and bid documents, all forming the contract documents Work under the Contract shall be completed in accordance with a construction time schedule mutually agreeable to the parties. Work must begin within ten (10) days of notice to proceed and be completed within 200 days of notice to proceed. Any request for adjustments to the identified project schedule shall be made to the Project Manager when Contractor becomes aware of anticipated delays in receipt of materials or adverse weather, etc. Provisions for liquidated damages for failure to comply with the Contract Time are set forth in the General Provisions. Time is of the essence to this Contract. The City requests bid proposals from licensed contractors to construct the Odessa Park Playground project located at the east terminus of Odessa Road, in the Sunnyside neighborhood of College Park on a parcel donated to the City. Questions Due September 24, 2021 at 4:00 p.m. All questions about the meanings or intent, discrepancies or omissions of the Contract Documents must be submitted by email on or before September 24, 2021 by 4:00 p.m.to Project Manager Brenda Alexander at balexander@collegeparkmd.gov . A bid bond is not required in connection with a bid submittal. A performance bond and labor and materials bond for 100% of the contract amount of the work is required. The City reserves the right to reject any and all proposals in the best interest of the City. This Project will include the construction of a new playground with various pieces of play equipment on a parcel of land donated to the City of College Park for recreational use. Other significant aspects of the Project include the construction of an asphalt path to provide access to the new playground from the east end of Odessa Road, a vegetated swale and a micro bio-retention structure for storm water management, native plantings, and the removal of an existing stand of bamboo. The selected playground equipment will provide activity for children aged 2 and older and will have a poured-in-place rubberized surface under the pieces of play equipment. Site amenities include benches and waste receptacles. The landscape plan includes a perimeter planting of native trees and shrubs to provide screening from the neighboring homes. The micro bioretention structure is planted with native grasses and plants. The Project includes removal of 16 trees and the eradication of an existing stand of bamboo. Bamboo removal will require cutting and digging of both the above ground and below ground plant parts and proper disposal of all resulting vegetation debris. Removal of the rhizomes and roots will require the use of an excavator or root rake to excavate all the below ground rhizomes and roots. The Project also includes continuing monthly inspections and maintenance by the successful bidder (Selected Contractor), after the completion of the Project, for one growing season to control any remaining growth of bamboo. Plans for the Project have been approved by Maryland National Capital Park & Planning Commission (M-NCP&P) Mandatory Referral process and the Prince George's Soil Conservation District for grading, erosion and sediment control
Award
Playgrounds / Parks / Athletic Fields
$265,142.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 5, 2021
November 4, 2021
Odessa Rd, College Park, MD
Related To This Project
College Park, MD
Bid Date: Sep 17 2025
College Park, MD
Bid Date: Oct 14 2025
College Park, MD
Bid Date: Oct 07 2025
College Park, MD
Bid Date: Oct 29 2025
College Park, MD
Bid Date: Dec 04 2025
College Park, MD
Bid Date: Dec 08 2025
College Park, MD
Bid Date: Feb 27 2026
College Park, MD
Bid Date: Apr 03 2019
College Park, MD
Bid Date: Jul 14 2025
College Park, MD
Bid Date: Jul 15 2025
College Park, MD
Bid Date: May 16 2025
College Park, MD
Bid Date: May 13 2025
College Park, MD
Bid Date: May 07 2025
College Park, MD
Bid Date: Apr 15 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
