BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Springfield, Oregon. Completed plans call for the renovation of a water / sewer project.

Contemplated work consists of furnishing all labor and equipment necessary for the following work: A. Flipping the old and new sand through the trench method shown in Detail 1 on C-1. This method is use in order to not place undue equipment pressures on the existing filter bed. B. Excavate and dispose of the dirty sand from edges of the liner of the Filter Bed #3 at SUB designated area (take extra care not to damage liner, any damage SUB will back charge the contractor to have a certified liner contractor repair). C. Removing approximately 14-Inches of existing sand from the bottom of the filter in trench/rows (leave 4-inchs of existing sand in place to avoid the gravel media under the sand). D. Installing approximately 18-Inches of new sand from the sand storage area. E. Cap the new sand with a 14-Inch layer of the removed existing sand. F. The top of the sand layer must be a uniform density and elevation so that the filter cleaning machine can operate on the surface. G. The top of the finished media shall be flat to within a tolerance of plus or minus 0.04 feet of the average elevation. H. Steel Tracks equipment is not allowed within the filter bed area due to the bed liner system. I. All equipment shall be steam cleaned and leak free prior to being mobilized onsite. J. Equipment needs food grade fluids for the hydraulics, coolant, grease, to access filter beds for placement of the sand media (preferred products BioFlo HEES 46, AMSOIL Propylene Glycol, TruGrease FG AP 2 or prior engineered approval). Note: This work is Prevailing Wage as determined by BOLI. No proposal will be considered by the Springfield Utility Board unless the Bidder agrees to be bound by and will comply with the provisions of ORS 279C.800 to 279C.870 and 40 U.S.C. 276(a) pertaining to prevailing wages, as applicable. Each bid must contain a statement as to whether or not the bidder is a resident bidder as defined in ORS 279A.120. Each bid must also contain a statement as to whether the bidder is registered with the Oregon Construction Contractors Board. No bid will be received or considered unless the bidder is registered with the Construction Contractors Board, as required by ORS 701.035.ET.SEQ. Faxed copies will NOT be accepted. Special minimum experience qualifications apply to portions of this project. General Contractors (Bidders) who are not already listed as pre-qualified by the Engineer shall submit to the Engineer a Request for Qualification complying in form and content to the requirements of the bid documents. The minimum qualifications and submittal requirements are specified in the Contract Documents. Requests for Qualification shall be presented to Engineer no later than 5 p.m., Pacific Standard Time, on 28th of September, 2021. All Requests for Qualification shall be sent directly to Steven Wages, P.E., Springfield Utility Board, 202 S 18th Street, Springfield, OR 97477, phone 541-744-3728. PROPOSALS SUBMITTED BY A NON-QUALIFIED GENERAL CONTRACTOR (BIDDER) SHALL BE CONSIDERED NON-RESPONSIVE AND SHALL BE REJECTED. First-tier and other subcontractors must be accepted by Springfield Utility Board prior to the pre-construction meeting. Proposals must be submitted on the prescribed forms. The successful bidder will be required to furnish to Springfield Utility Board a performance bond and a payment bond each equal to one hundred percent (100%) of the amount of the bid. The successful bidder and all subcontractors will be required to furnish to the Oregon Construction Contractors Board a public works bond in the amount of $30,000, unless exempt under ORS 279C. Acceptance of bids and award of contract will follow procedures provided by ORS 279C and in accordance with all applicable Springfield Utility Board policies. Springfield Utility Board reserves the right to reject any and all bids, to waive any irregularities, and to accept the bid deemed in the best interests of Springfield Utility Board. Springfield Utility Board may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the agency it is in the public interest to do so. Schedule A: Work shall commence no sooner than November 1st, 2021. Work shall be substantially complete on or before November 23rd, 2021. The Work shall be completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions on or before December 7th, 2021. Bid Security 7.1 N/A

Award

Water / Sewer

$109,998.00

Public - City

Renovation

3

10

4

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
14
Bidding Soon
181
All Active Projects
91
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 5, 2021

November 1, 2021

img_map_placeholder

1295 S 26th St, Springfield, OR

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.