Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Crescent City, California. Conceptual plans call for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.
As of December 30, 2021, this is a sources sought project. Although a firm timeline for construction has not been determined, bidding is estimated to take place in May of 2022 and construction is estimated to take place in July of 2022. *The closed solicitation has been included below for reference: The CA FTNP REDW 100(1), Cushing Creek Box Culvert project is located approximately 80 miles north of Eureka, CA in northwestern California. This project replaces the deteriorating Cushing Creek box culvert that serves Enderts Beach Road, which is a historic section of the original highway 101 corridor in Redwood National Park. The 60 linear feet (LF), 4' x 4' concrete box culvert is wearing substantially on interior surfaces from the high velocities and debris flow from Cushing Creek. The bottom portion of the culvert has multiple scour holes and water flow is undermining the culvert structure. The culvert lies approximately 18' deep under the roadway surface. A new 7'x7' concrete box culvert will be installed. New reinforced concrete headwalls will be installed on either ends of the culvert. This project replaces a deteriorating 4' x 4' concrete box culvert with a 7' x 7' prefabricated reinforced concrete box culvert with concrete headwalls in the same footprint. The project also includes approximately 100' of roadway replacement above the box culvert, along with the associated revegetation of slopes and permanent traffic control. SIGNIFICANT QUANTITIES: 15702-1000 Soil Erosion Control, Temporary Diversion Channel: LPSM 20103-0000 Clearing and Grubbing: 700 SQYD 20301-0300 Removal of Box Culvert: 1 EACH 20420-0000 Embankment Construction: 500 CUYD 20820-0000 Dewatering: LPSM 25101-0500 Placed Riprap, Method A, Class 5: 70 CUYD 60227-0000 Reinforced Concrete Box Culvert (7 Feet Span, 7 Feet Rise): 90 LNFT 62405-0300 Placing Conserved Topsoil, 4-Inch Depth: 400 SQYD 63501-0000 Temporary Traffic Control: LPSM MISCELLANEOUS: Road closures are allowed for up to 14 days for the box culvert replacement. Limits construction-caused delays to public traffic to a maximum of 15 minutes per passage through the project when closures are not in place. Construct concrete box culvert during low flow period. The anticipated advertisement date is May 2022 with construction anticipated from July 2022 to October 2022. This Is Not a Request for Bid Letter from bonding agent stating your firm's capability to bond for a single project of $900,000.00, and your firm's aggregate bonding capacity The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Bridges / Tunnels
$900,000.00
Public - Federal
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2022
Enderts Beach Rd, Crescent City, CA
Related To This Project
Crescent City, CA
--
Crescent City, CA
--
Crescent City, CA
Bid Date: Mar 01 2022
Crescent City, CA
Bid Date: Jan 05 2022
Crescent City, CA
Bid Date: Nov 27 2023
Crescent City, CA
Bid Date: Jan 10 2022
Crescent City, CA
Bid Date: Sep 27 2023
Crescent City, CA
Bid Date: Sep 27 2023
Crescent City, CA
Bid Date: Jul 24 2023
Crescent City, CA
Bid Date: Jul 12 2023
Crescent City, CA
Bid Date: Jun 30 2023
Crescent City, CA
Bid Date: May 11 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.