Site work and new construction of a medical facility in Raleigh, North Carolina. Completed plans call for the construction of a 103,600-square-foot medical facility.

This project will construct a new 103,600 GSF Equine Hospital on the Centennial Biomedical Campus (CBC) that replaces outdated facilities lacking vital units for critical care and sports medicine. The new hospital will include in-patient, outpatient, emergency, orthopedics, surgery, and ICU services with an isolation building, arena, and horse barns. It will house equine clinical teaching as well as integrated research laboratories for regenerative medicine and gastrointestinal health. The facility will provide: High-level technology and sophisticated equipment for state-of-the-art treatment that leads to signature programs focusing on imaging, standing surgeries, minimally invasive treatments, and forward-looking robotics use. Improve the human and animal experiences with cognizance of the key users: patients (animals), clients (owners), and faculty and staff. Provide a complex with pavilions for: inpatient, outpatient, emergency, isolation, and sports medicine, and healthy horse barns Biosecurity segregation is required within the ICU, inpatient/outpatient areas, and between the healthy horse and isolation stalls, as well as at the separate paddock zones for grazing. The facilities must comply with current best practices and requirements to prevent cross-contamination. The project will include all associated utilities infrastructure. Interested firms can participate in the process by submitting a proposal that addresses all the information requested by the Qualifications Questionnaire for CM at Risk. The Questionnaire will be available on August 29, 2022 through the Project Manager. In order that the selection process be as objective as possible, do not contact members of the Board of Trustees, or any university officials other than the project manager. All questions and project submittals are to be directed to: Laura Zaytoun, Project Manager NC State University, Capital Project Management Phone 919-515-8049 llzaytou@ncsu.edu Advanced Planning - April - September 2022 Design Start - October 2022 Construction Start - 2024 Completion - 2026 The contract will be negotiated with the CMR in two parts. Part one of the contract is pre-construction services. The second part of the contract is for bidding, construction, and close-out services. n order to offer Construction Manager at Risk services in the response to this solicitation, the proposer must be licensed as a general contractor in the state of North Carolina.

Post-Bid

Medical

$90,000,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
45
Bidding Soon
1,235
All Active Projects
512
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.