BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Butte, Montana. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

BSB Department of Public Works has hired Water & Environmental Technologies to develop a design for road, sidewalk, and stormwater improvements on Mercury Street from Shields Avenue to South Arizona Street. The existing asphalt has become compromised due to poor quality of subgrade material. New concrete curb, gutter and sidewalk will be placed on both sides of the newly constructed street. New stormwater infrastructure will be installed, and existing compromised stormwater infrastructure will be replaced. The CONTRACTOR must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex or national origin. Each bid or proposal must be accompanied by a Certified Check, Cashier's Check, or Bid Bond payable to Butte-Silver Bow County, in an amount not less than ten percent (10%) of the total amount of the bid. Successful BIDDERS shall furnish an approved Performance Bond and a Labor and Materials Payment Bond, each in the amount of one hundred percent (100%) of the contract amount. Insurance as required shall be provided by the successful BIDDER(s) and a certificate(s) of that insurance shall be provided. Persons with disabilities who need an alternative format of the RFB in order to participate in this Invitation for Bids process should contact Leslie Clark, Human Resources Director, Courthouse Building, 155 West Granite Street, Butte, Montana, 59701; telephone number: (406) 497-6429, FAX number (406) 497-6328, TTD number (406) 497-6223. The City and County of Butte-Silver Bow will make every effort to comply with such as request, as long as it is received within five (5) working days of the noticed bid acceptance closing date and time. The right is reserved to reject any or all proposals received, to waive informalities, to postpone the award of the contract for a period not to exceed sixty (60) days, and to accept the lowest responsive and responsible bid which is in the best interest of the OWNER. Butte-Silver Bow is an Equal Opportunity Employer. 1. Removal of existing asphalt and subgrade materials to the lines and grades shown in the construction plans. 2. Installation of geosynthetic fabric subgrade stabilization. 3. Installation of base coarse materials to the lines and grades shown in the plans. 4. Concrete work including: curb and gutter, sidewalk, stormwater infrastructure, relocation of existing fire hydrant, relocation of existing street light, and ADA ramps. 5. Adjustments of manholes, water utility structures, and other structures located within the project limits. 6. Relocation of sign(s) as shown on the construction plans. 7. Pavement markings including: road centerline, travel lanes, stop lines, and other miscellaneous markings. The project is located in Butte, MT, at on Mercury Street. The project is encompassed by Shields Avenue on the East end and South Arizona Avenue on the West end. The Project consists of concrete curb and sidewalk replacement, asphalt road rehabilitation, and stormwater infrastructure improvements. The Work generally consists of but is not limited to removal and replacement of existing concrete curb, sidewalk and asphalt, and reconstruction of the road cross section

Award

Roads / Highways

$1,344,771.00

Public - City

Paving, Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
5
Bidding Soon
92
All Active Projects
47
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 13, 2021

November 12, 2021

img_map_placeholder

W Mercury St, Butte, MT


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.