BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Evansville, Indiana. Completed plans call for site work for a water / sewer project.

Final questions to be submitted by October 26, 2021 to Heath A. Titzer – heath.titzer@clarkdietz.com and copy EWSU Project Manager, Ryan J. Mayer – rjmayer@ewsu.com Water main replacement running mainly along Claremont Avenue with sections tie-ins along Boehne, Bosse, Craig, and Barker Avenues. This project includes the abandonment of 9,700 LFT of existing 4-inch, 8-inch, and 12-inch pipe being replaced with approximately 10,000 LFT of 8-inch and 12-inch C-900 PVC pipe. The project also includes approximately 100 LFT of jack and bore crossing the CSX railroad at the intersection of Claremont and Barker Avenues. Work shall also include all supervision, equipment, traffic control, granular backfill, pavement restoration (milling included), flushing, disinfecting, testing, and all appurtenances necessary to complete the work shown in the Drawings and the Specifications Any contract or contracts awarded under this Advertisement for Bids is expected to be funded by a State Revolving Fund (SRF) Loan from the U.S. Environmental Protection Agency, administered by the Indiana Finance Authority (IFA). The Contractor to whom the work is awarded shall comply with all requirements of said agencies. Where conflict exists between this specification and the federal agency specifications, the more stringent shall apply. Neither the United States nor any of its departments, agencies, or employees is or will be a party to this Advertisement for Bids or any resulting contract. This procedure will be subject to all requirements of said agencies. If you have additional questions regarding access to plans, please email eplans@ewsu.com. The Evansville Water and Sewer Utility further reserves the right to waive informalities, and to award the contract to the lowest and most responsible bidder (or bidders), all to the advantage of the Evansville Water and Sewer Utility, or to reject all Proposals. MBE: 7% WBE: 5%

Award

Water / Sewer

$2,933,743.00

Public - City

Site Work

66

37

3

10

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
24
Bidding Soon
346
All Active Projects
189
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2021

January 3, 2022

img_map_placeholder

Multiple Locations, Evansville, IN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.