Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 27, 2022 at 7:00 PM

Updated November 15, 2023

Site work and new construction of an educational facility in Berkeley, California. Completed plans call for the construction of a 62-square-foot educational facility.

Name, Location and Access To Project a. Project Location: Martin Luther King, Jr. Student Union, Suite 72, University of California, Berkeley. b. Work Location: Martin Luther King, Jr. Student Union, Suite 72. c. Access: Permission for access to the site may be revoked for any and all persons who violate the University traffic regulations including, but not limited to, speed limits and parking restrictions. All Contractor's personnel, operations affiliates and delivery personnel shall be made aware of and shall comply at all times with campus traffic regulations. 2. Description Of Work a. General Requirements: The Contractor shall provide: qualified supervision; leads; workers and all labor; materials; equipment; services; transportation; insurance; licenses; building permits and all other items and work required to properly execute the intentions of the Contract. b. Scope of work includes, but is not limited to: i. Scope: Demo (2) existing trash enclosures in the Lower Sproul Parking Garage. Provide and install new ornamental welded steel fencing panels, gates, and posts. c. Intent of Document: i. It is the intent of the Contract Documents to include everything necessary for the proper completion of the project. Work necessary for completion or inferred by the Documents, even though not specifically shown or specified, shall be supplied. ii. Where removal of existing construction is required for performance of any work under this Contract, removal and replacement shall be accomplished whether shown or not. Replace existing trash enclosure gates with new, per project documents. Note from Marvin Collins Construction: This is a prevailing wage project. Subcontractors are responsible for weekly certified payroll reporting. Please acknowledge the architect, title and date of drawings on your bid. Please include your DIR number on your bid. No bid will be accepted without a valid DIR number. Marvin Collins Construction is signatory to the Northern CA Carpenters Union Master Agreement. Subcontractors are responsible for their own parking expenses. Waiver of Subrogation is required for workers compensation. Additional insured endorsement will be required for general liability. Direct all questions to francisco@marvincollinsconstruction.com, joshua@marvincollinsconstruction.com and adam@marvincollinsconstruction.com Note from Marvin Collins Construction RFI's are due 10-22-2021, Noon PT Job Walk Photos have been released. Addendum #1 has been issued.

Bid Results

Educational

$68,000.00

Public - State/Provincial

New Construction, Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
546
Active Projects
197
Bidding Soon
3,487
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed