EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 25, 2022 at 8:00 PM

Updated October 1, 2024

Site work and new construction of a museum in Naperville, Illinois. Completed plans call for the construction of a museum; and for site work for a museum.

Proposals as herein concerned shall be for the following as described: BID GROUP NO. 2 BID PACKAGES 5- 15 Bid Package #05 - General Trades/Carpentry Bid Package #06 - HVAC Bid Package #07 - Plumbing Bid Package #08 - Electric Bid Package #09 - Glazing/Storefront Bid Package #10 - Metal Roofing Bid Package #11 - Overhead Doors Bid Package #12 - Flooring Bid Package #13 - Paint Bid Package #14 - Fire Protection Bid Package #15 -- Landscaping Pre-qualification of all bidders in this bid group is required prior to the bid due date. The competency and responsibility of the bidders will be considered in making awards. A fully executed and compliant Bid Security must be included with the Bid Form. All Contracts for the Construction of Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12). The Construction Manager for this project is Wight Construction Services, Inc. All questions concerning this project or those concerning bidding requirements should be directed to: George Gardner at 331.201.5542 Questions must be received via email to ggardner@wightco.com no later than 3:00 PM (CDT Tuesday, October 26, 2021). No bid shall be withdrawn after the opening of bids without the consent of the Chief Procurement Officer for a period of 60 days after the scheduled time of the bid opening. Naperville Heritage Society reserves the right to reject any and all bids and to waive any informalities, technicalities and irregularities in the bidding. Bidders shall comply with all provisions and laws of the United States and State of Illinois concerning Public Works projects including but not limited to the Illinois Human Rights Act, and the regulations of the Illinois Human Rights Commission. Please send email to ggardner@wightco.com to receive electronic invitation after 3:00 PM on Monday, October 18, 2021 Bid Results HVAC Amber Mechanical Contractors Inc. 158200 Plumbing Triton Plumbing 84399 Electric Advanced Data Technologies 2,01,808.00 Metal Roofing Inc Metalmaster Roofmaster 147739 Landscaping Twin Oaks Landscaping 34,681.00 Flooring TSI Commercial Floor Covering 61,667.00 Paint DES Painting Inc 22,500.00 Fire Protection Nelson Fire Protection 22,048.00 Overhead Doors Door System 75,740.00 General Trades/Carpentry R B Construction, Inc 3,85,000.00 Glazing/Storefront CAD Glazing 219300

Bid Results

Museum

$1,413,082.00

Public - City

New Construction, Site Work

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Demonstration and Training, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Site Demolition, Selective Structure Demolition
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Framing, Heavy Timber, Shop-Fabricated Structural Wood, Finish Carpentry, Architectural Woodwork, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Exterior Insulation and Finish Systems, Steep Slope Roofing, Roof Tiles, Roofing and Siding Panels, Metal Roof Panels, Siding, Wood Siding, Mineral-Fiber Cement Siding, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Fire and Smoke Protection, Applied Fireproofing, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Sectional Doors, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Flooring, Carpeting, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, High-Performance Coatings
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Exterior Specialties, Protective Covers, Manufactured Exterior Specialties, Cupolas, Weathervanes
Division 12 - Furnishings

Division 12 - Furnishings

Casework
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Identification for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Pneumatic and Electric Control System for HVAC, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central Heating Equipment, Fuel-Fired Heaters, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Identification for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Power Filters and Conditioners, Voltage Regulators, Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Planting, Turf and Grasses, Seeding
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
284
Active Projects
179
Bidding Soon
2,181
All Active Projects
1,097
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2021

January 3, 2022

img_map_placeholder

523 S Webster St, Naperville, IL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

AG (Agricultural Interpretive) Center and Thresher Pavilion - Bid Group No. 2 Bid Packages 5 - 15

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.