BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Monticello, Illinois. Contact the soliciting agency for additional information.

Piatt County is seeking bids for snow removal of sidewalks for County facilities. Signed Proposal: Each Proposal must be an original and hard copy and signed by an authorized member of the Contractor's firm. This member should be the highest-ranking officer at the local level. NO ORAL Proposals will be accepted. Each Proposal must be submitted in the Proposal Forms (Forms attached to this Document) Copies of Proposal: The contractor shall submit the original proposal completed and with signature. Email Clarifications: The County intends to communicate with contractors via email (Example: clarifications and addendums). Except for the delivery of the proposal itself. Reservation of Award: The contract will be awarded to the responsible bidder whose proposal is within the competitive range and determined to be the most advantageous. Price, experience, references, and other factors are considered. The Piatt County Board Members or its designee reserves the right to reject any or all bids, in part or in total, for any objective or subjective reason whatsoever. The Contractor will be responsible for clearing the sidewalks of snow and ice, and for distributing salt/ice melt. Below is a list of buildings requiring snow removal of sidewalks and salting. 1. Piatt County Office Building 1115 N. State St Monticello, IL 2. Piatt County Courthouse 101. W Washington Monticello, IL 61856 3. Piatt County Public Safety Building 1216 Raymond Rd Monticello, IL 61866 The Contractor shall ensure that all designated sidewalks to be cleared of snow/ice. Contractor shall work with the Supervisor of Maintenance to prioritize needs to allow access to buildings. Snow removal must be available at the Contractor's pricing 24 hours a day, 7 days a week, including holidays. The Contractor will need to be available for "on call" services, twenty-four (24) hours a day, seven (7) days a week, the Supervisor of Maintenance may call for services. The Contractor shall be responsible for snow removal from sidewalks and applying salt/ice melt to the facilities on all days, including weekends.

Post-Bid

Sidewalks / Parking Lot

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
34
Bidding Soon
435
All Active Projects
220
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2021

November 1, 2021

img_map_placeholder

Multiple Locations, Monticello, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.