EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2022 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Chesapeake, Virginia. Contact the soliciting agency for additional information.

ID/IQ Installing, Developing, Testing, Rehab, and Abandoning Production and Monitoring Wells. The Work under this Project consists of drilling, installing, developing and completing pumping tests at a new production well, rehabilitating existing production wells using aggressive mechanical and pumping techniques, and abandoning any production or monitoring wells as needed. This is an indefinite delivery indefinite quantity (IDIQ) solicitation that will result in IDIQ contracts awarded to multiple contractors on a multiple award work/task order basis Questions regarding this project must be submitted in writing via email to Suzan Sadler, (ssadler@cityofchesapeake.net), by 5:00 PM local time on May 12, 2022. The Work under this Project consists of drilling, installing, developing and completing pumping tests at a new production well, rehabilitating existing production wells using aggressive mechanical and pumping techniques, and abandoning any production or monitoring wells as needed. This is an indefinite delivery indefinite quantity (IDIQ) solicitation that will result in IDIQ contracts awarded to multiple contractors on a multiple award work/task order basis. Bid Security in the amount of FIVE percent (5%) of the Bid shall be submitted with each Bid. Each Bidder shall submit a letter of certification from their surety that an Erosion and Sediment Control Surety Bond in the amount of $ will be issued if the Bidder is awarded the contract. Period of performance: three (3) years from the date of execution with two (2) additional one (1) year renewal options upon the mutual written agreement of Withdrawal of Bids due to error shall be subject to and in accordance with Section 2.2-4330 of the Code of Virginia, Chesapeake City Code Chapter 54, and the Contract Documents. The Owner reserves the right to waive minor non-substantive informalities in the Bid, to reject any/or all Bids, to award any Bid in whole or in part and award the Bid considered to be in the best interest of the Owner. The Owner also reserves the right to negotiate with the lowest responsive, responsible Bidder should Bid exceed available funds by no more than 5%, in accordance with Chesapeake City Code Section 54-63(7). The City of Chesapeake does not discriminate in the solicitation or awarding of contracts on the basis of race, religion, faith-based organizations, color, national origin, age, disability or any other basis prohibited by state or federal law.

Post-Bid

Water / Sewer

$350,000.00

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Remediation, Physical Decontamination
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Sanitary Sewerage, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Service Connections, Fuel Distribution Utilities, Natural-Gas Distribution
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Machining Equipment, Drilling Equipment, Dies and Molds, Dies
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors, Liquid Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
35
Bidding Soon
717
All Active Projects
307
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2022

June 27, 2022

img_map_placeholder

Multiple Locations, Chesapeake, VA

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Indefinite Delivery/Indefinite Quantity (IDIQ) Installing, Developing, Testing, Rehab, and Abandoning Production and Monitoring Wells

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.