BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 8, 2021 at 7:00 PM

Updated January 17, 2025

Renovation of an educational facility in San Diego, California. Completed plans call for the renovation of a educational facility.

Bid Packages: Bid Package No. Description License(s) Required Estimated Construction Value 01.74 Final Cleaning C61/D-63 $15,006 02.41 Demolition C-21 $124,272 05.70 Decorative Metal C-23 or C-43 $78,130 06.20 Finish Carpentry C-6 $116,010 08.41 Aluminum-Framed Entrances and Storefront & Glazing C-17 $72,680 08.87 Glazing Surface Films C-61/D-52 $5,760 09.60 Flooring & Tile C-15 and C-54 $215,127 09.91 Painting & Wall Coverings C-33 $44,112 10.14 Signage C-45 $18,511 12.20 Window Treatments C-61/D-52 $9,600 21.11 Fire Sprinklers C-16 $69,815 22.00 Plumbing C-36 $72,981 23.00 HVAC C-20 $386,059 26.27.28 Electrical, Low Voltage & Fire Alarm C-10 $741,161 The Geisel Library Revitalization project consists of limited renovations on the second floor of the Geisel Library to create modern, collaborative and technology-rich spaces. The interior tenant improvements would include an active learning classroom, integrated service hub, consultation spaces, central meeting place, all gender single-occupancy restroom, Mother's Nursing room, along with renovations to corridors, a gallery space, and Library's main entry. Modifications to the building systems, including IT/Data, fire alarm, fire sprinklers, mechanical, electrical, and plumbing are required as part of the work effort. Approx. 21,100 sq. ft. Construction duration of project 129 Construction Days. Construction duration is from: 12/06/2021 to 06/24/2022. Swinerton Builders, Inc. and UC San Diego encourage the participation of Small, Disadvantaged, Minority-owned, Women-owned and Service/Disabled Veteran-owned Business Enterprises (S/D/M/W/DVBE's) and is committed to promote a diverse pool of firms for our building programs. Potential bidders will be required to submit their small business outreach plan to the University as part of the prequalification process. Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each Bidder may be required to show evidence of its equal employment opportunity policy. The successful Bidder and its subcontractors will be required to follow the nondiscrimination requirements set forth in the Bidding Documents and to pay prevailing wage at the location of the work. The work described in the contract is a public work subject to section 1771 of the California Labor Code. No contractor or subcontractor, regardless of tier, may be listed on a Bid for, or engage in the performance of, any portion of this project, unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 and 1771.1. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The successful Bidder shall pay all persons providing construction services and/or any labor on site, including any University location, no less than the UC Fair Wage (defined as $15 per hour as of 10/1/17) and shall comply with all applicable federal, state and local working condition requirements. For further information regarding scope of work please contact Mark Gagne at (619) 204-2187 or mgagne@swinerton.com. Should you have questions regarding plan distribution, please contact Meagan Macias at (858) 815-2417 or mmacias@swinerton.com. Location: Geisel Library 9500 Gilman Drive La Jolla, CA 92093 (Bidders shall meet at the walkway directly in front of the Library's Entrance - See image for meeting location). Health Protocols: All persons attending, must provide and wear at all times while on campus, a mask covering their mouth and nose. PRE-BID RFI'S: 1. All pre-bid RFI's shall be emailed in a Microsoft Excel table to the following individuals: Mark Gagne and Stephanie Foy Project Manager Lead Estimator E-mail: mgagne@swinerton.com sfoy@swinerton.com 2. The deadline for submission of pre-bid RFI's is November 4, 2021. 3. Responses to pre-bid RFI's is planned for November 10, 2021. Bid Result. Final Clean:Construction Cleaning Service $ 11,549.00 Demolition:Cement Cutting Inc. $ 104,800.00 Decorative Metal:Ehmcke Sheet Metal $ 42,837.00 Finish Carpentry:Spooners Woodworks $ 188,925.00 Aluminium Framed Entracnes and Storefront Glazing:Discount Glass & Mirror $ 106,852.00 Glazing Surface Film:Solar Art $ 12,814.00 Painting & Wall Covering:Bonas Company $ 72,180.00 Signage:Charlaine $ 5,988.00 Window Treatment:Contract Décor $ 6,990.00 Fire Sprinkler:Titan Fire Protection $ 77,354.00 Plumbing:RL Fick $ 35,700.00 HVAC:Able $ 252,825.00 lectrical, Low Volt, Fire Alarm:Neal Electric $ 1,031,977.02

Bid Results

Educational

$2,345,628.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
370
Active Projects
58
Bidding Soon
2,069
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2021

December 6, 2021

Project location map

9500 Gilman Dr, San Diego, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.