BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to an educational facility in Columbus, Nebraska. Completed plans call for the addition of a educational facility; for the renovation of a educational facility; for site work for a educational facility; and for the demolition of a educational facility.

https://columbustelegram.com/news/local/lakeview-looks-to-expand-staff/article_5fb410b7-d735-52ab-a578-c117b6ccba3e.html LLakeview Community Schools in Columbus is hoping to hire a number of new teachers to expand its staff as the district moves ahead on an addition to Shell Creek Elementary School. In November, the school board accepted BD Construction in Columbus' $2.47 million bid to build an additional six classrooms on to the existing Shell Creek Elementary School building, 16786 280th St. in Columbus. The addition will allow Lakeview to expand the district's preschool capacity and add sections of kindergarten, first, second and third grades over time. At the school board's most recent meeting on Monday evening, school officials discussed the need for additional staff that will accompany the new classes. "What we had talked about doing for (the) 2022-2023 (school year) was the addition of preschool, preschool para, kindergarten, kindergarten para, first grade teacher and a...P.E. teacher (two out of five days of the week)," Superintendent Aaron Plas said at Monday's meeting. "...We would like to start advertising for these late December or early January and have them done by the end of January or early February." Plas laid out how the district hopes to cover the cost of the additional personnel. "The preschool/preschool para we think we can do...at least partially under an early childhood grant. The kindergarten and first grade teacher we could do under the stimulus package, and then obviously we have the (kindergarten) para and the P.E. teacher who would be under our normal general fund," Plas said. Plas said the plan would be to add the second and third grade teachers during the 2023-2024 school year. However, Lakeview Junior-Senior High School Principal Steve Borer admitted that the pool of new graduates has been thin. "We've been fortunate to find really good ones out of a thin pool...but you're not getting a lot of numbers," Borer said. Plas said there were 950,000 people enrolled in teaching college nationally in 2010. "And as of 2018, there were 600,000, and that (ratio) is about what we're seeing in the state," Plas said. "...The number of unfilled positions in the state (of Nebraska) in 2010 was 50, and last year it was 340. And that's not all in Omaha, there are schools in our area that are (having a tough time) filling positions." Plas added that the district has had difficulty finding enough substitutes this year, more so than in the past. "It's been rough, sub-wise. We've managed significantly better than some places, but it's been well worse this year than it's ever been in the past as far as getting subs," Plas said. He said some of the subs that the district have relied on in the past took jobs elsewhere this year. "One potential option is (turning) that two-fifths P.E. teacher...into a full-time position and have them three days a week as a sub," Plas said. The board gave Plas the green light to go ahead with that idea. _______________ PN - 021-06995, 011-0853 Lakeview Shell Creek Elementary School Classroom Addition Qualified bidders may submit bids for project as described in this Document. Submit bids according to the Instructions to Bidders. The Work of the Project involves all construction indicated on the drawings and specifications, included but not limited to the following: Construction of walls, floors, roofs, structural systems, mechanical systems, electrical systems, interior and exterior finishes and associated site work for the renovation of and additions to the Shell Creek Elementary School building. Bid security in the form of either surety bond or certified check payable to the Owner shall be submitted with each bid in the amount of 5 percent of the bid amount. No bids may be withdrawn for a period of 30 days after opening of bids. Owner reserves the right to reject any and all bids and to waive informalities and irregularities. Bidders must be properly licensed under the laws governing their respective trades and be able to obtain insurance and bonds required for the Work.

Award

Educational

$2,000,000.00

Public - County

Addition, Demolition, Renovation, Site Work

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
35
Bidding Soon
500
All Active Projects
197
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 23, 2021

January 3, 2022

img_map_placeholder

16786 280th St, Columbus, NE

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.