BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 13, 2022 at 7:00 PM

Updated November 15, 2023

Site work and renovation of a water / sewer project in Douglas, Wyoming. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Project Category Code: Water Resources Infrastructure, Equip Repair, Water/Wastewater Infrastructure, Water and Wastewater Facilities Description: The project consists of adding and regrading the sand media in all three slow sand filters as well as replacing aging testing equipment on the filters. In addition, there will be modifications made to the existing steel header pipes coming from the Clearwell and the addition of a new magnetic flow meter. Substantial Completion Date: April 15, 2022 Final Completion Date: April 30, 2022 Liquidated Damages. Owner and Contractor recognize that time is of the essence of this Agreement and that Owner will suffer financial loss if the Work is not substantially complete by the times specified in Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not substantially completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty) Contractor shall pay Owner One-Thousand Dollars ($1,000.00) for each day that expires after any of the times specified in Paragraph 3.2 for substantial completion. It is further agreed that such liquidated damages are not a penalty, but represent the parties' best estimate of actualdamages.

Award

Water / Sewer

$790,350.00

Public - City

Renovation, Site Work

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
16
Bidding Soon
157
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2021

December 31, 2021

Project location map

To Be Determined, Douglas, WY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.