BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 18, 2022 at 7:00 PM

Updated November 15, 2023

Site work for a water / sewer project in Burlington, Massachusetts. Completed plans call for site work for a water / sewer project.

Installation of pipe stubs and valves through portions of the structure of the existing Mill Pond water treatment plant. Excavation is required to expose walls where cores are proposed through which pipe stubs will be installed. Coring will be through concrete and rebar within the existing filter channel, clearwell, and waste tank and installing ductile iron pipe stubs for future connections to a PFAS Treatment Building (to be constructed under a separate contract). This project will also includes insertion valves, exploratory test pitting, and installation of erosion control measures, and management of soils excavated as part of the work.

Award

Water / Sewer

$311,900.00

Public - City

Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
566
Active Projects
259
Bidding Soon
3,887
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 24, 2021

January 1, 2022

Project location map

Multiple Locations, Burlington, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.