Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 14, 2022 at 7:00 PM

Updated November 14, 2023

Renovation of an educational facility in Santa Cruz, California. Completed plans call for the renovation of a educational facility.

Remove and replace the 4-way switch 18 (SW-18), per plans and specifications designed by Central Pacific Engineering, Inc. Requests for clarification or interpretation of the Bidding Documents shall be received no later than 5:00 PM on November 30, 2021 and addressed only to: Steven Irie University of California, Santa Cruz Physical Planning, Development & Operations 1156 High Street, Barn G Santa Cruz, CA 95064 sirie@ucsc.edu

Bid Results

Educational

$468,900.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
392
Active Projects
148
Bidding Soon
2,601
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2021

January 10, 2022

Project location map

To Be Determined, Santa Cruz, CA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed