Demolition, site work, paving and new construction of a civil project in Holyoke, Colorado. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; road / highway; and road / highway.

Region: 4 Counties: Phillips Contract UDBE Goal: 8.00 % Guaranty: 5% of Total Bid Work Days: 320 This Project Consists of the Removal and Replacement of Five Separate Bridge Locations in and Around Holyoke. Three of the Structures Will Be Two Span Bridges and One Will Be a Single Span Bridge. These Will Utilize Steel Piling Foundations With Concrete Box Girders for Construction. One Structure Will Be Replaced by a Double Cell Concrete Box Culvert. All Sites Include Earthwork, Channel Grading, Riprap Installation, Roadway Resurfacing With Hot Mix Asphalt or Concrete Pavement. The Installation and Removal of on-site Detours is Planned for All Five Locations. Temporary and Permant Pavement Marking, Temporary and Permanent Slope Stabilization, Delineation, and Construction Traffic Control Will Be Needed. The Construction of a Hydraulic Drop Structure is Required at One Location. Utilities Will Need to Be Cleared Before Construction is to Begin. All Sites Will Have Temporary Easements for Construction Use and the Concrete Box Culvert Will Have Permant Easements Along With Temporary Easements. This project is located in Region 4 in Phillips County. Project work consists of the removal and replacement of five separate bridge locations in and around Holyoke. Please contact Jeffrey Dollerschell at 970-521-9714 for all project related questions. It is estimated that the total cost of all items in the bid will be: ( ) Between $0 and $1,000,000 ( ) Between $1,000,000 and $5,000,000 ( ) Between $5,000,000 and $20,000,000 (X) Greater than $20,000,000 CO DOT: 001 - Region 4 - Bridge Removal/Replacements *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Bridges / Tunnels

$19,126,166.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

752

7

5

8

Subscribe For Documents

61 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
1
Bidding Soon
25
All Active Projects
8
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 17, 2024

December 16, 2024

img_map_placeholder

Multiple Locations, Holyoke, CO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.