Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 25, 2024 at 7:00 PM
Updated November 26, 2024
Demolition, site work, paving and new construction of a civil project in Holyoke, Colorado. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; road / highway; and road / highway.
Region: 4 Counties: Phillips Contract UDBE Goal: 8.00 % Guaranty: 5% of Total Bid Work Days: 320 This Project Consists of the Removal and Replacement of Five Separate Bridge Locations in and Around Holyoke. Three of the Structures Will Be Two Span Bridges and One Will Be a Single Span Bridge. These Will Utilize Steel Piling Foundations With Concrete Box Girders for Construction. One Structure Will Be Replaced by a Double Cell Concrete Box Culvert. All Sites Include Earthwork, Channel Grading, Riprap Installation, Roadway Resurfacing With Hot Mix Asphalt or Concrete Pavement. The Installation and Removal of on-site Detours is Planned for All Five Locations. Temporary and Permant Pavement Marking, Temporary and Permanent Slope Stabilization, Delineation, and Construction Traffic Control Will Be Needed. The Construction of a Hydraulic Drop Structure is Required at One Location. Utilities Will Need to Be Cleared Before Construction is to Begin. All Sites Will Have Temporary Easements for Construction Use and the Concrete Box Culvert Will Have Permant Easements Along With Temporary Easements. This project is located in Region 4 in Phillips County. Project work consists of the removal and replacement of five separate bridge locations in and around Holyoke. Please contact Jeffrey Dollerschell at 970-521-9714 for all project related questions. It is estimated that the total cost of all items in the bid will be: ( ) Between $0 and $1,000,000 ( ) Between $1,000,000 and $5,000,000 ( ) Between $5,000,000 and $20,000,000 (X) Greater than $20,000,000 CO DOT: 001 - Region 4 - Bridge Removal/Replacements *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Bridges / Tunnels
$19,126,166.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 17, 2024
December 16, 2024
Multiple Locations, Holyoke, CO
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
