BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a road / highway in The Hills, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Colored concrete trail, Limestone wall, Small sign relocation, Manhole adjustment, CMP & SET replacement, 4" limestone riprap. Please submit questions for this project by close of business November 30, 2021 through portal. Liquidated Damages: $1,000.00 per day Construction Days: 180 calendar days 1. Construct approximately 4,200 linear feet of 5 feet wide concrete walking trail along The Hills Drive, between Dovedale Cove and approximately 100 feet east of the dam. 2. The walking trail is expected to cross multiple driveways, and it is assumed that the Village will secure any construction encroachment agreements, if needed, for reconstruction of the driveways to accommodate TAS-compliant cross-slopes. A CERTIFIED CHECK or an acceptable bid bond in an amount of not less than five percent (5%) of the total bid shall accompany each bid as a guaranty that, if awarded the contract, the bidder will promptly enter into contract with Village of The Hills, and furnish bonds on the forms provided. BIDDERS are expected to inspect the site of the work and to inform themselves of all local conditions. Time of completion shall be 180 calendar days including Saturdays, Sundays, and legal holidays. THE SUCCESSFUL BIDDER OR BIDDERS will be required to furnish a Performance Bond, Payment Bond, and Maintenance Bond as stipulated in the specifications. NO BID may be withdrawn after the scheduled closing time for receipt of bids for at least ninety (90) calendar days. THE CITY reserves the right to reject any and/or all bids, waive any and/or all formalities, and award the bid as it appears most beneficial to Village of The Hills. SPECIFICATIONS may be examined without charge at Village of The Hills. Contract documents including bid proposal forms, plans sheets, and specifications for the Project may be viewed and electronic free of charge (with the option to purchase hard copies).

Bid Results

Roads / Highways

$636,313.00

Public - City

Paving, Site Work

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
37
Bidding Soon
2,357
All Active Projects
882
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2021

January 5, 2022

img_map_placeholder

The Hills Dr, The Hills, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.