BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in West Palm Beach, Florida. Completed plans call for site work for a water / sewer project.

**As of January 14, 2022, the project has not been awarded yet. A timeline for award is not yet determined. The Bid Documents received by this time will be opened the same day, December 15, 2021, in accordance with the Invitation to Bid and Instructions to Bidders, at or after 2:00 PM in the Administration Building, Conference Room (Room 158). The bids will be for furnishing all materials, labor, supervision, equipment, supplies, fees, expertise, and services necessary for the replacement of water mains throughout thirteen (13) project locations within Palm Beach County Water Utilities Department service areas. Consisting generally of, but not limited to, installation of potable water mains, installation of an aerial canal crossing, installation of sanitary force main, installation of a horizontal directional drill (HDD), fire protection improvement, replacement of water service lines, and water service conversions, as well as associated appurtenances including site restoration of affected areas. All conditions and requirements for bid submission, consideration, and award are contained in the Bid Documents. The Bid Documents will be available to download free of charge beginning November 9, 2021. Please visit Palm Beach County's Vendor Self Service page to access the Bid Documents. If you have not registered with Palm Beach County's Vendor Self-Service, please register and select the appropriate commodity code(s). This will allow the County to notify you of upcoming solicitations. In addition, there may be certain documents necessary for submittal of a bid which are exempt from public disclosure. Bidders shall download and submit a Plan Holder Registration form (Bid Document attachment) to access these exempt documents. Registered Plan Holders will automatically receive notification of addenda and project updates. When Bid Documents are obtained through a plan house, Bidders must notify the Palm Beach County Water Utilities Department's Project Manager via e-mail in order to be registered to receive project addendums and communications. Questions may be addressed in writing to Ralph Estime, PMP at or Palm Beach County Water Utilities Department, 8100 Forest Hill Blvd., West Palm Beach, FL 33413. Pursuant to the Palm Beach County Code Section 2-80.20 2-80.40, the Equal Business Opportunity (EBO) Ordinance, the County will provide contracting and subcontracting opportunities for S/M/WBEs. The following Affirmative Procurement Initiatives (APIs) apply to this project: The SBE subcontracting goal for this project is a mandatory minimum of 20% participation, See EBO Ordinance Section 2-80.27(1)(c), of which 3% shall be among certified African American and/or Hispanic American owned firms, See EBO Ordinance Section 2-80.27(2)(b). Explanation of goal setting committee's reasons for applying this API: The goal setting committee's reason for applying this particular API to this project was that the most recent data on the utilization of the foregoing MBEs indicates that contracts of this type have exhibited significant disparities in the utilization of these MBEs. When a mandatory SBE or M/WBE goal applies to this solicitation, then any bid that fails to comply with the required goal shall be deemed non-responsive after the period allowed for waiver requests has lapsed. If a bidder is unable to comply with a required goal, such bidder shall submit a request for a waiver or partial waiver at least 7 days prior to the bid due date. If a bidder requests a waiver from a goal from the Office of EBO at least 7 days prior to the bid due date, then the bid due date will be extended pending the outcome of a waiver request. Additionally, if the waiver is granted the solicitation will be amended accordingly and the due date extended again. Fillable pdfs of all EBO forms can be found on the OEBO website. Also, see the EBO Ordinance and Countywide PPM CW-O-043 for further information on the County's EBO Program. At the time of bid submission each bidder, and all identified subcontractors, must possess all professional licenses or certifications required by the State of Florida and/or Palm Beach County, as applicable, for the purpose of performing the specified work. A public construction bond (100%) will be required of the successful bidder within fourteen calendar days of notification from County. Palm Beach County Water Utilities Department Central Regional Operations Center (CROC) Administration Building Conference Room 158 8100 Forest Hill Blvd., Room 158 West Palm Beach, FL 33413 In accordance with F.S. 287.133(2)(a), persons and affiliates who have been placed on the convicted vendor list may not submit bids, contract with, or perform work (as a contractor, supplier, subcontractor or consultant) with any public entity (i.e. Palm Beach County) in excess of Ten Thousand dollars (or such other amount as may be hereafter established by the Florida Division of Purchasing in accordance with F.S. 287.017) for a period of 36 months from the date of being placed on the convicted vendor list. The Board of County Commissioners reserves the right to waive any bid irregularities, informalities, or technical deficiencies and to reject any and all bids. Questions may be addressed in writing to Ralph Estime, PMP at Destime@pbcwater.com or Palm Beach County Water Utilities Department, 8100 Forest Hill Blvd., West Palm Beach, FL 33413. Liquidated Damages: The Contractor shall pay the Owner $500.00 for each calendar day that expires after the time specified for Substantial Completion and $250.00 for each calendar day beyond the date of Final Completion.

Award

Water / Sewer

$5,757,115.00

Public - County

Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
276
Active Projects
134
Bidding Soon
1,935
All Active Projects
818
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 15, 2021

June 1, 2022

March 28, 2023

img_map_placeholder

Multiple Locations, West Palm Beach, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.