BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Ottawa, Ontario. Completed plans call for site work for a bridge / tunnel; road / highway; sidewalk / parking lot; for paving for a road / highway; and sidewalk / parking lot.

CDB is requesting proposals for a Subcontractor to complete works on the overall project, exclusive of the advance work packages awarded to date. For the rehabilitation of Union Bridge the scope of work includes, but is not limited to, removal and replacement of the reinforced concrete deck and sidewalk, structural steel repairs and replacement of stringers, structural steel coating up to 2m above the road deck, jacking, new bearings, reconstruction of: ballast walls, bearing seats and retaining walls, and the rehabilitation of the abutment wall faces. For the widening of the Hull Causeway, the scope or work includes, but is not limited to, removal of the existing west deck overhang and widening of the concrete deck including new bearings, installation of new girder 5, widening of the reinforced concrete substructure at Pier 1, construction of the North Approach Abutment including new foundations, new concrete barriers, and a new raised cycle track. The scope of works also includes various works common to both structures including but not limited to railings, bridge deck waterproofing, raised concrete cycle track, structural excavation, support of excavation (SOE), roadworks, waterproofing and hot mix paving. Various advance work packages have already been procured for the project and therefore not part of this scope of work, including: temporary access platforms at Union Bridge, installation of district thermal heating pipes, demolition of abandoned steam pipes and existing steel walkways hanging from Union Bridge, supply and fabrication of girders for Hull Causeway, supply and fabrication of new stringers at Union Bridge, traffic staging, traffic signal modifications, Bell Canada utility works, the widening of the reinforced concrete abutment at Hull Causeway and the repair and strengthening of the structural steel trusses supporting Hull Causeway. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Bridges / Tunnels

$300,000.00

Public - Federal

Paving, Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
36
Bidding Soon
614
All Active Projects
259
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 21, 2022

February 21, 2022

img_map_placeholder

Chaudière Crossing, Ottawa, ON


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.