BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving, outdoor lighting and new construction of a mixed-use development in Sunrise, Florida. Conceptual plans call for the demolition of a playground / park / athletic field; for the construction of a 15,000-square-foot playground / park / athletic field; fitness / recreation center; for outdoor lighting for a playground / park / athletic field; for site work for a playground / park / athletic field; 250-space sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Under the G.O. Bond, the City purchased the Cypress Bay Annex facility from the School Board and made minimal improvements so that the new area was useable. Phase 2 work on the Cypress Bay Annex site may include, construction of 100 paved parking spaces, construction of 150 stabilized grade overflow parking spaces, construction of a 15,000 square foot multi-purpose building with a gymnasium, landscaping, irrigation, and site lighting. At Oscar Wind, work includes the replacement of the existing bathroom, a new boardwalk on the shoreline with a canoe/kayak launch area. The existing fields will remain. Security improvements will be included and costs will be determined during design. As of November 21, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Playgrounds / Parks / Athletic Fields

$8,500,000.00

Public - City

Demolition, New Construction, Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
46
Bidding Soon
1,109
All Active Projects
492
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2025

img_map_placeholder

200 N New River Cir, Sunrise, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.