BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 21, 2022 at 7:00 PM

Updated January 25, 2024

Site work, paving, outdoor lighting and new construction of a mixed-use development in Sunrise, Florida. Conceptual plans call for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; service station / car wash facility; sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

This project proposes to develop a 1.85 acre parcel located on the northwest corner of the Hiatus Road and NW 29th Manor into a passive park. Given its proximity to the Hiatus Greenway, the new park would provide a rest area for cyclists, walkers, and joggers using the trail. Initially, the park would be cleared of existing invasive and exotic landscaping material. The new park would provide open space with amenities that include a pavilion, drinking fountain, bicycle repair station, benches and tables, 600 linear feet of paved walkways, solar lighting, and native plant material. This project promotes sustainability by eliminating invasive plant materials, promoting alternative methods of transportation, and utilizing solar lighting. As of November 21, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Playgrounds / Parks / Athletic Fields

$342,000.00

Public - City

New Construction, Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
279
Active Projects
135
Bidding Soon
1,821
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2025

Project location map

Hiatus Rd & NW 29th Manor, Sunrise, FL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.