BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 21, 2021 at 7:00 PM

Updated January 9, 2025

Site work and new construction of an educational facility in Citrus Heights, California. Completed plans call for the construction of a educational facility.

Please take notice that the San Juan Unified School District is issuing a Request for Proposals to qualified entities for Lease-Leasebackservices pursuant to Education Code section 17406 to provide preconstruction and construction related services for the new construction and associated site work for the construction of Mesa Verde HS Outdoor Learning Facilities. Preconstruction services, including without limitation providing review of and input on design documents, value engineering, estimating, preliminary scheduling, and bidding to develop the Total Base Rent Construction Services: SITE DEMOLITION, CLEAR AND GRUB OF EXISTING NATURAL GRASS FIELD, FOLLOWED BY CONSTRUCTION OF A SYNTHETIC TURF SOCCER/FOOTBALL FIELD WITH GOAL POSTS AND ALL-WEATHER TRACK SURFACING FOR 400 METER, 9 LANE RUNNING TRACK. NEW NFHS FIELD EVENTS TO BE CONSTRUCTED INCLUDING NEW DISCUS CAGE, SHOT PUT, LONG JUMP, TRIPLE JUMP, AND POLE VAULT. CONSTRUCTION ALSO TO INCLUDE RESTROOM AND CONCESSION BUILDING AND TICKET BOOTH. INSTALLATION OF ASSOCIATED HARDSCAPE, SCOREBOARD, FENCING, LANDSCAPE, SOD RENOVATIONS FOR BALL FIELDS, DRINKING FOUNTAINS, SITE UTILITIES, AND PATH OF TRAVEL AND ACCESSIBLE PARKING IMPROVEMENTS FOR ACCESSIBILITY REQUIREMENTS. ALSO INCLUDED ARE LOOSE SITE FURNISHINGS, INCLUDING BUT NOT LIMITED TO, HURDLES, PADS, SOCCER GOALS, SOCCER CORNER FLAGS, HIGH JUMP AND POLE VAULT STANDARDS AND LANDING PADS, TRACK CROSSING MATS, NEW SCOREBOARD BLEACHERS, PRESS BOX, AND SPORTS FIELD LIGHTING. Post-construction lease of the facilities License required: B General Building Contractor Estimated total cost of the Project: $ 15 Million Estimated Lease Term: five months of construction and 12 months tail. [12/10/2021] Anticipated District selection of successful LLB Entity [1/25/2022] Anticipated Board award of LLB instrument

Post-Bid

Educational

$15,000,000.00

Public - County

New Construction, Site Work

3

13

2

6

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2021

February 4, 2022

Project location map

7501 Carriage Dr, Citrus Heights, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.