BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 5, 2025 at 7:00 PM

Updated December 6, 2025

Site work and paving for a mixed-use development in Citrus Heights, California. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of December 3, 2025, per the owner, the city is currently pursuing funding for the project, so they have not selected a design firm or general contractor. A start date for construction has not been determined. ________________________________________ The City of Citrus Heights is soliciting proposals from qualified firms to provide professional services for the Old Auburn Road Complete Streets Project (Phase 1). This project is funded by a federal Active Transportation (ATP) grant administered through Caltrans Office of Local Assistance. The Project is the first phase to transform Old Auburn Road to a complete street from Tiara Way (west of Sunrise Boulevard) to Garry Oak Drive (east of Fair Oaks Boulevard). A conceptual plan for the Project is incorporated into the Old Auburn Complete Streets Plan, which is available on the city's site. Proposer's submittal shall be as follows: A maximum of fifteen (15) sheets of paper with printing on both sides (double-sided) totaling thirty (30) pages of information, inclusive of the cover letter, resumes, graphics, etc. Required Local Assistance paperwork does not count toward the page limit. One (1) electronic (Adobe PDF) on a memory stick and three (3) bound copies. Proposal must be received (not postmarked) and date stamped by a designated city employee. Proposals shall be marked: Proposal for Old Auburn Road Complete Streets Project (Phase 1) There is no Pre-Proposal Meeting for this RFP. Questions regarding this RFP shall be submitted in writing, by email only, to the General Services Department and must be received no later than 4:00 PM, February 24, 2022. Inquiries submitted via email shall be clearly marked on the subject line "Old Auburn Road Complete Streets Project (Phase 1) - Question" and emailed to: generalservices@citrusheights.net AND LBlomquist@citrusheights.net Consultant interviews are tentatively scheduled for 9 AM to Noon, March 17, 2022. The Project shall comply with requirements of the Caltrans LAPM regarding DBE participation. The City has established a DBE goal of 30%. Additional DBE requirements and general information can be found in the appendices. The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$10,697,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
475
Active Projects
245
Bidding Soon
2,285
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2027

Project location map

Old Auburn Rd, Citrus Heights, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.