BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work, renovation and addition to an educational facility in Morgan Hill, California. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

*As of December 7, 2022, a general contractor has been awarded. Project Number-01-119819, 21-7600.20, 3552 DSA FILE NUMBER 43-38 APPL# 01-119819 Please contact Scott Burnham at Aedis Architects with any questions. The Governing Board of the Charter School of Morgan Hill reserves the right to accept or reject any or all bids and to act as sole judge of the merit and qualifications of the proposals offered. work, potable water system work, electrical and low voltage connections, and new utility connections of new and existing buildings. 9) All finish grades, site work, hardscape, planting and irrigation, site accessories as shown in the Contract Documents is the responsibility of the General Contractor. 10) The General Contractor shall provide all power and low voltage systems underground conduits and pull boxes to 5'-0" outside the new modular building's footprints and the points of connection shall be coordinated with the modular manufacturer. General Contractor shall provide all power and low voltage systems and underground conduit and pull boxes for all relocated buildings. 11) Complete install of fire alarm system at modular buildings and relocated modular buildings, and new exterior lighting and controls. 12) The General Contractor shall provide, pull, terminate and test all feeders from existing distribution panel, fiber optic cable, telephone, clock, speaker and fire alarm cabling from connection point to the building. In addition, all low voltage wiring, termination and testing inside and between building shall be the responsibility of the General Contractor. This shall include, but not be limited to telephone outlets, data outlets, fiber optic cabling, fire alarm wiring, and power wiring. The General Contractor will also provide and install new distribution conduits and wiring as contained within the contract documents. 13) The General Contractor shall insure all utilities and building systems for and in the relocated buildings, the new buildings, and modernized existing buildings are fully complete and in working order. 14) Contractor shall provide all required temporary facilities and utilities through the entire course of construction. Questions regarding documents, discrepancies, omissions, or doubt as to meanings shall be referred immediately to the Architect who will send written instructions clarifying such questions to each bidder. All questions must be submitted in writing by October 25, 2022, 5:00pm PST

Award

Educational

$16,539,777.00

Public - City

Addition, Demolition, Renovation, Site Work

274

45

4

Subscribe For Documents

87 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
66
Bidding Soon
1,390
All Active Projects
607
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 15, 2022

March 3, 2023

img_map_placeholder

9530 Monterey Rd, Morgan Hill, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.