BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a mixed-use development in Pollock Pines, California. Completed plans call for site work for a water / sewer project; and playground / park / athletic field.

The anticipated work of the Project generally consists of replacing the approximately 4.5 mile connection between the District's Reservoir 1 and Reservoir A Water Treatment Plants. The project is located 10 miles east of the City of Placerville and 1.5 miles southwest of Pollock Pines, California. Only pre-qualified firms will be eligible to bid on the Project. A California Classification A contractor's license is required. The estimated date of construction is June 2024 through October 2025. All questions about the meaning or intent of the pre-qualification documents must be submitted in writing (via e-mail) to Project Manager, Liz Carrington, P.E., no later than 3:00 p.m. local time on Friday, December 15, 2023 to the following e-mail address: E-mail: lcarrington@eid.org The estimated construction cost is $30.0 Million. The District reserves the right to adjust, increase, limit, suspend or rescind the prequalification rating based on subsequently learned information. Contractors whose rating changes sufficient to disqualify them will be notified and given an opportunity for a hearing consistent with the hearing procedures described below for appealing a pre-qualification rating.

Award

Playgrounds / Parks / Athletic Fields

$35,000,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
64
Bidding Soon
887
All Active Projects
365
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2024

July 23, 2024

img_map_placeholder

4771 Sly Park Rd, Pollock Pines, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.