Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 20, 2022 at 7:00 PM

Updated November 15, 2023

Site work for a transportation facility in Saint Paul, Minnesota. Completed plans call for site work for a runway / taxiway.

Airfield Snowmelter Replacement/Upgrade There will be an option to participate in the meeting remotely, either on-line or by telephone. Anyone wishing to attend remotely should contact Dan Palmer, TKDA, (Phone 651.925.7487) no later than Monday, December 6 The construction site is inside the Air Operations Area (AOA). Contractors desiring to inspect the site shall contact Pete Boyer of TKDA (Phone: 612.369.0972) to arrange for AOA access The MAC has an established contract goal for the utilization of Targeted Group Businesses on this project of 4 %

Bid Results

Transportation Terminals

$1,012,814.00

Public - City

Site Work

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
116
Bidding Soon
1,683
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2021

May 2, 2022

Project location map

4300 Glumack Dr, Saint Paul, MN

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed