BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 10, 2022 at 7:00 PM

Updated November 15, 2023

Renovation of a municipal facility in Palmer, Alaska. Working plans call for the renovation of a municipal facility.

The Alaska Court System is soliciting proposals for the above project in Palmer, Alaska. Project consists of but is not limited to the removal of existing cast iron boilers and installation of two new cast iron boilers along with mechanical room improvements per the design drawings. The estimated construction cost is between $90,000 and $130,000. This is an estimate only. Project Address: Palmer Courthouse 435 South Denali Street Palmer, Alaska 99645 Substantial Completion required, by May 20, 2022. Final Completion, including Final Pay Request, required by June 20, 2022. Scope- Demo existing three cast iron boiler & replace with new cast iron boilers, Boiler Circulation Pumps, associated piping and related accessories. Furnish all labor, materials, equipment, etc Remove grease, mastic, adhesives, dust, dirt, stains, fingerprints, temporary labels, protection films, and other foreign matter from sight exposed interior and exterior surfaces ALT #1- Bid same base scope pulse the replacement of the Heating System Pumps, Associated piping and related accessories, using Alternates Schematics M104, M204, E201, E202 The scope of work includes replacement of three cast iron boilers with two cast iron boilers, boiler circulation pumps, associated piping. and related accessories. For information and/or a bid packet, please contact. (907) 264-0427 or email dmaschner@akcourts.gov All questions, concerns, or clarifications regarding the project must be emailed to Dean Maschner at dmaschner@akcourts.gov Please keep in mind that an oral response to a question at the site inspection is not binding on the ACS. After the site inspection the ACS will distribute to all prospective bidders an addendum listing the questions asked and the court system's official responses. The cut-off date for contractor questions is 4 calendar days before the bid Date. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Municipal

$130,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
2
Bidding Soon
147
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2022

August 10, 2022

Project location map

435 S Denali St, Palmer, AK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.