BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Palmer, Alaska. Working plans call for the renovation of a municipal facility.

The Alaska Court System is soliciting proposals for the above project in Palmer, Alaska. Project consists of but is not limited to the removal of existing cast iron boilers and installation of two new cast iron boilers along with mechanical room improvements per the design drawings. The estimated construction cost is between $90,000 and $130,000. This is an estimate only. Project Address: Palmer Courthouse 435 South Denali Street Palmer, Alaska 99645 Substantial Completion required, by May 20, 2022. Final Completion, including Final Pay Request, required by June 20, 2022. Scope- Demo existing three cast iron boiler & replace with new cast iron boilers, Boiler Circulation Pumps, associated piping and related accessories. Furnish all labor, materials, equipment, etc Remove grease, mastic, adhesives, dust, dirt, stains, fingerprints, temporary labels, protection films, and other foreign matter from sight exposed interior and exterior surfaces ALT #1- Bid same base scope pulse the replacement of the Heating System Pumps, Associated piping and related accessories, using Alternates Schematics M104, M204, E201, E202 The scope of work includes replacement of three cast iron boilers with two cast iron boilers, boiler circulation pumps, associated piping. and related accessories. For information and/or a bid packet, please contact. (907) 264-0427 or email dmaschner@akcourts.gov All questions, concerns, or clarifications regarding the project must be emailed to Dean Maschner at dmaschner@akcourts.gov Please keep in mind that an oral response to a question at the site inspection is not binding on the ACS. After the site inspection the ACS will distribute to all prospective bidders an addendum listing the questions asked and the court system's official responses. The cut-off date for contractor questions is 4 calendar days before the bid Date. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Municipal

$130,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
2
Bidding Soon
126
All Active Projects
45
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.