BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Berkeley, California. Completed plans call for the renovation of a five-story above grade educational facility; and five-story above grade library.

Separate contracts will be awarded for the various elements of the Project Work. The separate contracts comprising the Project have separate liquidated damages provisions for each. Universitys Representative will coordinate the separate contracts, working within the framework of the Contract Schedule. The Moffitt Library Seismic Safety Project includes the strengthening of 86 existing reinforced concrete columns in the 5 story undergraduate library. The structure is composed of reinforced concrete columns and slabs with post-tensioned floor beams and girders. Work includes selective abatement, selective demolition, fiber-reinforced polymer column wraps, plaster column finish, and associated build back. At each level, the majority of work can be accessed above the existing floor and below the existing ceiling. Work is scheduled to begin at the start of March 2022 and be complete in Summer 2022, prior to the start of the Fall 2022 Semester. The building will be vacated or partially occupied during construction SP01.1 General Requirement, Carpentry, Misc. Trades, Stone Assemblies and Tile: Please refer to Trade Breakdown dated December 7. 2021. Estimated Construction Cost: $1,036,000 SP01.2 Non-Structural Demolition and Abatement: Please refer to Trade Breakdown dated December 7. 2021. Estimated Construction Cost: $162,000 SP03.1 - Fiber-Reinforced Polymer Reinforcement: Please refer to Trade Breakdown dated December 7. 2021. Estimated Construction Cost: $859,000 SP08.2 Glazing: Please refer to Trade Breakdown dated December 7. 2021. Estimated Construction Cost: $49,000 SP09.1 Plaster: Please refer to Trade Breakdown dated December 7. 2021. Estimated Construction Cost: $318,000 SP22.1 Plumbing: Please refer to Trade Breakdown dated December 7. 2021. Estimated Construction Cost: $50,000 SP26.1 Electrical and Low Voltage: Please refer Only the following trade packages need to submit a Statement of Experience: SP01.1 SP03.1 SP09.1

Bid Results

Library

$375,000.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
53
Bidding Soon
1,805
All Active Projects
778
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2022

March 11, 2022

img_map_placeholder

350 Moffitt Library, Berkeley, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.