BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 17, 2024 at 8:00 PM

Updated September 18, 2024

Site work and paving for a mixed-use development in Rensselaer, New York. Completed plans call for site work for a bridge / tunnel; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including, but not necessarily limited to the following: Culvert Replacement[Provide a description of work included. E.g. Installation of approximately 3,500 ft of sidewalks with or without curb; signing and striping including the installation of crosswalks, pedestrian traffic signal upgrades, drainage modification, resurfacing, bridge replacement, etc.] Question Deadline 08/30/2024 Questions regarding the Contract Documents should be directed to Sheri Kern through email at: skern@gpinet.com No questions or inquiries regarding this bid will be accepted within five (5) business days prior to the bid opening. The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including, but not necessarily limited to the following: Culvert Replacement The MBE goal for this project is: 8% The WBE goal for this project is: 15% The SDVOB goal for this project is: 6% There are no DBE goals for this project. The EEO Employment goals for this project are: 2.6% Minority Employment Goal 6.9% Women Employment Goal No questions or inquiries regarding this bid will be accepted within five (5) business days prior to the bid opening. Questions regarding the Contract Documents should be directed to Sheri Kern through email at: skern@gpinet.com. Bidders shall promptly notify Sheri Kern of any errors, omissions, conflicts or ambiguity within the Contract Documents within 14 days of bid opening Each bid must be accompanied by security in an amount not less than five percent (5%) of the amount of the bid in the form and subject to the conditions provided in the Instructions to Bidders. The work will be substantially completed 120 calendar days from Notice to Proceed with road closure and completed and ready for final payment on or before September 1, 2025.

Bid Results

Bridges / Tunnels

$889,035.00

Public - City

Paving, Site Work

36

7

23

5

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
378
Active Projects
211
Bidding Soon
2,349
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2024

October 14, 2024

Project location map

Wilson St, Rensselaer, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.