BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a playground / park / athletic field in Desoto, Texas. Completed plans call for the construction of a 80,000-square-foot playground / park / athletic field; and for site work for a playground / park / athletic field.

The City of DeSoto, TX ("City") is seeking to hire a qualified Construction Manager at Risk firm ("CMAR" or "CM") as defined to provide preconstruction and construction management services for a new Recreation and Indoor Aquatics Center ("Project") that will be located at existing Curtistene S. McCowan Park property in DeSoto. Through this Request for Qualifications ("RFQ"), the City is seeking Qualification Statements from interested and qualified firms. The city would like at a minimum of 20% total project of WMBE and HUB participation. The Project will involve the construction of a new Recreation and Indoor Aquatics Center for the City of DeSoto, Texas that will be located at the site of the existing Curtistene S. McCowan Park (formerly Meadow Creek Park) property. The Project will potentially construct an enclosed building footprint in the range of 70,000-80,000 GSF supporting program use for indoor recreation, fitness, wellness and indoor aquatics. The aquatics portion of the project will encompass a natatorium space with an indoor competitive pool (25m x 25yd), a separate indoor leisure pool and locker rooms as wet-side program spaces supporting community use, swim competition and training. The City of DeSoto retained SmithGroup as the Architect of Record ("Project Architect") for professional architectural engineering design services associated with this project including full design services beginning with PreDesign/Programming phase activities through Construction Administration. The PreDesign phase services by the Architect, which include program validation and concept planning began in May with Schematic Design expected to begin in July/August 2022. Construction Documents are anticipated to be completed by the Architect by July 2023 with Construction of the Project expected to be substantially complete by December 2023 for move-in and occupancy in January 2025. The CMaR will be an integral member of the project team which consists of representatives from the City of DeSoto, DeSoto Parks & Recreation, the project Architect/Engineer (Project Design Team), and other consultants, as determined by the City. Generally, it will be the responsibility of the construction manager to integrate the design and construction, utilizing the firm's skills and knowledge of general contracting to contribute to the successful development of the project during the design pre-construction phases. During the construction phase, the CM will be responsible for effecting construction of the project within the Guaranteed Maximum Price (GMP) and providing all necessary construction services through trade contractors selected and as provided by the Agreement between Owner and Construction Manager at Risk. The CMaR Contract will be performed in three (3) phases, which will include Phase I - Pre-Construction Services, Phase II - Guaranteed Maximum Price (GMP), and Phase III - Construction Services. The first phase will be comprised of utilizing the conceptual design and developing preconstruction services through schematics design and a schematic budget estimate. The second phase will include the negotiation of the Guaranteed Maximum Price and the CM contract. The third and final phase will include the implementation project including permitting, project construction and construction closeout activities. Must submit a statement from an A- or better Surety Company licensed to do business in Texas attesting to the firm's bonding capacity to provide adequate performance and payment bonds for this project. In the event you believe that this information is proprietary, submit a single copy of the document(s) containing this information in a separate, sealed envelope marked "Confidential" together with a stamped, self-addressed envelope. The Town will return all confidential, proprietary information to you at the termination of the selection process. If the above fifteen day requirement is not met, the City of Desoto has the right to reject this bid and award the contract to the next lowest bidder meeting specifications. If you have any questions concerning these requirements, please contact the Purchasing Manager (972) 230-9685

Post-Bid

Playgrounds / Parks / Athletic Fields

$53,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
76
Bidding Soon
3,620
All Active Projects
1,315
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.