Site work and outdoor lighting for a civil project in Sugar Land, Texas. Completed plans call for site work for a water / sewer project; and for outdoor lighting for a road / highway.

Sugar Creek Water Well No. 4 Rehabilitation: The work includes providing bonds and insurance; constructing temporary fencing; trimming existing landscape to allow access to the work area outside the plant fence, as approved by the Engineer or City; removing and inspecting the pumping equipment; replacing the pump and rebuilding the 350 hp motor; sounding the lap; performing any necessary mechanical and chemical rehabilitation to the well; replacing all column assembly components and accessories to a pump setting of 450 feet (450'); installing the pump, motor, column assembly and accessories; bacteriological testing; performing water well performance test; disinfecting the water well; performing water sampling and testing before and after water well rework; restoring site grading to original or better condition and hydromulching all areas within the plant site and all other adjacent areas disturbed during this construction; removing and replacing four (4) 16-inch butterfly valves, one (1) 16-inch silent globe check valve, two (2) 12-inch gate valves, flow meter, air release valve assembly, pressure gauge, high pressure cut-off switch, heated oiler excluding bucket, three (3) chemical injection points from the ground to the quill, and DIP from the first 45 degree bend on the well piping to the first flange outside of the fence; blast and recoat above well piping; install work platform including stairs and handrails at oiler; replace site lighting with LED and new photocell; install on/off/auto switch for field lighting; fill in washed out low spot under the well piping; acid wash GST riser pipes (if needed); and remove the security fence including post in the ground, security box, cap security line at ground; and all items needed for a functioning water well. Alternatives for replacing the 350 hp motor and replacing the DIP from the first flange outside of the fence to GST No. 2 will be included. Greatwood West Water Well No. 4 Rehabilitation: The work includes providing bonds and insurance; removing and inspecting the pumping equipment; replacing the pump and rebuilding the 250 hp motor; sounding the lap; performing any necessary mechanical and chemical rehabilitation to the well; replacing all column assembly components and accessories to a pump setting of 400 feet (400'); installing the pump, gear drive, motor, column assembly and accessories; bacteriological testing; performing water well performance test; disinfecting the water well; performing water sampling and testing before and after water well rework; restoring site grading to original or better condition and hydromulching all areas within the plant site and all other adjacent areas disturbed during this construction; replace discharge head; two (2) 12-inch butterfly valves; flowmeter; air release valve assembly; pressure gauge; high pressure cut-off switch; heated oiler excluding bucket; 1-inch PVC line downhole for water level measurement and/or chemical injection; and one (1) chemical inject point from the ground to the quill; blast and recoat aboveground well piping; power wash and recoat fuel tank; inspect and rebuild right angle drive; replace insulation for gear drive cooling line; remove and reinstall the sound wall around the well; install lighting inside enclosure; and PLC/SCADA modifications provided by Prime Controls; and all items needed for a completely functioning water well. Alternatives for replacing the 250 hp motor, replacing the 12-inch globe check valve, and adding new conduit from flowmeter to the motor control center will be included. Homeward Way Water Well Rehabilitation: The work includes providing bonds and insurance; removing and inspecting the pumping equipment; replacing the pump and motor; sounding the lap; performing any necessary mechanical and chemical rehabilitation to the well; replacing all column assembly components and accessories to a pump setting of 460 feet (460'); installing the pump, motor, column assembly and accessories; bacteriological testing; performing water well performance test; disinfecting the water well; performing water sampling and testing before and after water well rework; restoring site grading to original or better condition and hydromulching all areas within the plant site and all other adjacent areas disturbed during this construction; remove all aboveground well piping to the first flange below ground and cover; replace all aboveground well piping including pipe supports, discharge head, three (3) 12-inch butterfly valves, one (1) 12-inch silent globe check valve, flowmeter, air release valve assembly, pressure gauge and sample tap, high pressure cut-off switch, heated oiler including bucket, and two (2) chemical injection points from the ground to the quill; install 1-inch PVC downhole for water level measurement and/or chemical injection; blast and coat aboveground well piping; replace site lighting with LED and a new photocell; remove and reinstall building over well; replace light pole and exterior lighting; PLC/SCADA modifications provided by Prime Controls; and all items needed for a completely functioning water well. The deadline to ask questions is 1/07/2022 5:00 PM CST

Post-Bid

Water / Sewer

$1,114,000.00

Public - City

Outdoor Lighting, Site Work

Subscribe For Documents

56 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
53
Bidding Soon
2,698
All Active Projects
1,108
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2022

February 14, 2022

img_map_placeholder

Multiple Locations, Sugar Land, TX

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.