BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a water / sewer project in Suffolk, Virginia. Completed plans call for the demolition of a water / sewer project; and for site work for a water / sewer project.

Everetts Production Well Abandonment The project will involve several activities including the following: 1. Abandon one 14-inch diameter production well with a depth totaling 993 feet. 2. Abandon the one well following Virginia Administrative Code 12VAC5-630- 450. 3. A licensed well driller in Virginia will complete Virginia Department of Environmental Quality Well Abandonment Form GW-5 for Everetts well, executing the form and provided a license number. 4. Demolish the well house and perimeter fence surrounding the abandoned well and remove the building materials. 5. Removal of wooden pole and equipment where electrical power feeds the well (onsite pole, not the Dominion pole). 6. Restore the well site to the original condition at the start of the project. B. The Contractor shall check the access to each well and plan the operation accordingly. The location of Everetts well, particularly appears remote from a water source, and may require hauling water to the site to complete development. C. The project is located on the Izaak Walton property, located at 480 Kings Fork Road, Suffolk, VA 23434. The Contractor shall access the Izaak Walton property behind Kings Fork Middle School between the hours of 8:30 am and 1:00 pm or after 3:30 pm Monday through Friday, or any time on Saturday or Sunday. This will ensure that vehicles are not in the bus ramp during arrival and dismissal times. D. Grassy areas shall be matted for vehicular traffic, and the Contractor will repair any damage to the grounds or asphalt that occurs while accessing the site. Contractor will obtain approval for any tree and limb clearing if necessary to access the site from the City of Suffolk Department of Public Utilities. The Contractor shall furnish all labor, materials, equipment and means to construct the project entitled Abandoning Everetts Production Well for the City of Suffolk Department of Public Utilities as shown on Drawings and described herein. The work includes, but is not limited to, the following: 1. Abandoning production well and any associated aboveground structures at the City of Suffolk Everetts well. 2. Certifying proper abandonment on Well Abandonment Form, GW-05. 3. Restore the areas around each monitoring well to their original condition. B. The above general outline of principal features does not in any way limit the responsibility of the Contractor to perform all work and furnish the required materials, equipment, labor and means as shown or required by the Contract Documents. C. Materials, equipment, labor, etc., obviously a part of the work and necessary for the proper operation and installation of same, although not specifically indicated in the Contract Documents, shall be provided as if called for in detail without additional cost to the Owner. D. Successfully completing Items 1 through 3 as listed above represents the requirements for Substantial Completion.

Award

Water / Sewer

$110,100.00

Public - City

Demolition, Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
44
Bidding Soon
714
All Active Projects
271
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2022

February 18, 2022

img_map_placeholder

480 Kings Fork Rd, Suffolk, VA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.