BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 9, 2022 at 7:00 PM

Updated November 15, 2023

Demolition, site work, paving and new construction of a bridge / tunnel in Cheboygan, Michigan. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

0.06 mi of reconstruction of timber bridge including timber approach rails and slope protection on Little Black River Bridge south of Martha Street in the city of Cheboygan, Cheboygan County. This is a Local Agency project. Control Sec Job No Federal No NRT 16000 210779A 22A0136 Net classification required for this project is 1057 Fa MDOT - 2202 010 - Reconstruction of Timber Bridge Including Timber Approach Rails and Slope Protection on Little Black River Bridge

Award

Bridges / Tunnels

$936,964.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
9
Bidding Soon
192
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2022

April 5, 2022

Project location map

Martha St, Cheboygan, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.