Site work and paving for a civil project in Palm Springs, California. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

The Department Will Receive Sealed Bids for Construction on State Highway in Riverside County Near Moreno Valley From 0.2 Mile North of Alessandro Boulevard Overcrossing to 0.2 Mile South of Eucalyptus Avenue Overcrossing The contractor shall implement the following items of work as first order work activities prior to commencing the work indicated on the contract plans. These work activities shall be show on the Construction CPM Schedule. No work shall proceed until these work items are completed to the satisfaction of the Tribal Monitor and Engineer. 1. Install ESA Fencing. 2. Install storm water BMPs. 3. Construct temporary access road (maintain existing roadway until temporary access road is complete) and staging areas at the Murray Canyon Bridge and Andreas Canyon Bridge Crossings. Submit all questions to dmalcolm@aguacaliente.net, attention: Dan Malcolm, Director of Planning A bid guarantee equivalent to five percent of the bid price. The "bid guarantee" must consist of a firm commitment such as a bid bond, certified check, or other negotiable instrument accompanying a bid as assurance that the bidder will, upon acceptance of the bid, execute such contractual documents as may be required within the time specified. A performance bond on the part of the contractor for 100 percent of the contract price. A "performance bond" is one executed in connection with a contract to secure fulfillment of all the contractor's obligations under such contract. A payment bond on the part of the contractor for 100 percent of the contract price. A "payment bond" is one executed in connection with a contract to assure payment as required by law of all persons supplying labor and material in the execution of the work provided for in the contract. First day of construction job site activities, March 14, 2022. Andreas Canyon Parking Area Culvert Crossing. Initiate construction activities beginning no sooner than July 5, 2022. All items of construction at the Andreas Canyon Parking/Camping Culvert Crossing shall be substantially completed on or before September 29, 2022. These dates shall be identified in the Contractor's CPM Baseline Schedule and subsequent schedule updates. Last day of construction, 100% substantial completion and acceptance of the work, on or before September 29, 2022. Complete the work, excluding plant establishment work, within 90 working days. Complete the work, including plant establishment work, within 340 working days. Complete the plant establishment work within 250 working days.

Award

Roads / Highways

$4,460,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
322
Active Projects
161
Bidding Soon
2,104
All Active Projects
981
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 28, 2022

March 14, 2022

September 29, 2022

img_map_placeholder

E Andreas Rd & N Palm Canyon Dr, Palm Springs, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.