Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Panama City Beach, Florida. Contact the soliciting agency for additional information.
For Air Terminal Roof Cleaning North-west Flori-da Beach-es Inter-na-tion-al Air-port Dar-lene D. Gor-don, CPA Direc-tor of Finance and Administration I. Gen-er-al Conditions A. The pur-pose of this bid is to estab-lish a firm, fixed price for clean-ing of the met-al air ter-mi-nal build-ing roof, to include inte-grat-ed sky-lights, at the air-port in accor-dance with pur-chas-ing poli-cies of the North-west Flori-da Beach-es Inter-na-tion-al Airport. B. Bids must be received in the Air-port Admin-is-tra-tive Office at 6300 West Bay Park-way, Box A, Pana-ma City Beach, Flori-da, by 2:00 p.m., CST on Feb-ru-ary 8, 2022 in order to be con-sid-ered respon-sive. Bids must be plain-ly marked, "Air Ter-mi-nal Roof Clean-ing - Feb-ru-ary 8, 2022. C. The Air-port reserves the right to reject any one or all bids, or any part of any bid, to waive any infor-mal-i-ty in any bid and to award a con-tract deemed to be in the best inter-est of the Airport. D. In the event a brand name is spec-i-fied, that brand or an approved equiv-a-lent will be con-sid-ered, unless oth-er-wise not-ed. Brand names, makes, and mod-el num-bers con-tained here-in are for ref-er-ence only in regards to lev-el of qual-i-ty, per-for-mance, con-struc-tion mate-r-i-al, and dura-bil-i-ty that the Air-port will accept as a minimum. E. All ques-tions regard-ing this bid shall be in writ-ing and direct-ed to accounting@pcairport.com . Ques-tions will be accept-ed until 2:00 p.m. CST on Feb-ru-ary 2, 2022. All ques-tions and respons-es will be made avail-able on the Air-port's web-site at: www.iflybeaches.com no lat-er than 5 p.m. CST on Feb-ru-ary 4, 2022. F. Requests to sched-ule a site vis-it to eval-u-ate the scope of work should be direct-ed in writ-ing to accounting@pcairport.com. Sight vis-its will be accom-mo-dat-ed Mon-day through Fri-day between the hours of 8:00 a.m. and 4:00 p.m. through 5 p.m. CST on Feb-ru-ary 7, 2022. G. All bids must be valid for a min-i-mum of 60 days after the bid is opened. H. The suc-cess-ful bid-der shall war-ran-ty labor for a peri-od of one year from the date of accep-tance of the work. I. The suc-cess-ful bid-der shall sup-ply the Air-port with war-ran-ty infor-ma-tion on the mate-ri-als used for this project. J. No alter-ations or devi-a-tions involv-ing extra costs will com-mence with-out a duly exe-cut-ed Change Order. K. The suc-cess-ful bid-der shall be licensed in the State of Flori-da to per-form the type of work request-ed under this Invi-ta-tion to Bid. L. The suc-cess-ful bid-der will be respon-si-ble for obtain-ing any required per-mits and con-duct-ing an accep-tance inspection. M. All chem-i-cals used shall be man-u-fac-tur-er approved for the type of appli-ca-tion request-ed under this Invi-ta-tion to Bid. N. The suc-cess-ful bid-der shall not be liable for any fail-ure of or delay in the per-for-mance of this Agree-ment for the peri-od that such fail-ure or delay is due to caus-es beyond its rea-son-able con-trol, includ-ing but not lim-it-ed to acts of God, war, strikes or any oth-er force majeure event. II. Scope of Work The Air Ter-mi-nal Roof Clean-ing shall be per-formed in accor-dance with the fol-low-ing specifications: Specifications A. The scope of work includes the clean-ing of the air ter-mi-nal met-al roof at the North-west Flori-da Beach-es Inter-na-tion-al Air-port as shown on the attached dia-gram. If need-ed, Con-trac-tor is respon-si-ble for ver-i-fy-ing square footage. B. The scope of work shall also include clean-ing of the sky-lights inte-grat-ed into the roof structure. C. Work shall be per-formed with-out dis-rup-tion of nor-mal airport/aircraft operations. D. Work shall be per-formed dur-ing nor-mal work-ing hours which, for this project, are 7 a.m. - 5 p.m. CST. E. Chem-i-cals, at a min-i-mum, with con-tain a chlo-rine-based algae-cide, as well as a gen-er-al detergent. F. Con-trac-tor shall not use any chem-i-cals, or deter-gents, that will harm, or accel-er-ate, nor-mal dete-ri-o-ra-tion of the roof or roof-ing materials. Ill. Insur-ance Requirement SC-2 Insur-ance The Con-tac-tor shall pro-cure and main-tain the fol-low-ing described insur-ance, except for coverage(s) specif-i-cal-ly waived by Own-er, on poli-cies and with insur-ers accept-able to Own-er. These insur-ance require-ments shall not lim-it the lia-bil-i-ty of Contractor. The insur-ance coverage(s) and lim-its required of Con-trac-tor under this Invi-ta-tion to Bid are designed to meet the min-i-mum require-ments of Own-er and the Own-er does not rep-re-sent these types or amounts of insur-ance to be suf-fi-cient or ade-quate to pro-tect the Con-trac-tor's inter-ests or lia-bil-i-ties. Con-trac-tor alone shall be respon-si-ble to the suf-fi-cien-cy of its own insur-ance program. The Con-trac-tor and the Con-trac-tor's sub-con-trac-tors and sub-sub-con-trac-tors shall be sole-ly respon-si-ble for all of their prop-er-ty, includ-ing but not lim-it-ed to any mate-ri-als, tem-po-rary facil-i-ties, equip-ment and vehi-cles, and for obtain-ing ade-quate and appro-pri-ate insur-ance cov-er-ing any dam-age or loss to such prop-er-ty. The Con-trac-tor and . the Con-trac-tor's sub-con-trac-tors and sub-sub-con-trac-tors shall express-ly waive any claim against the Own-er aris-ing out of or relat-ing to any dam-age or loss of such prop-er-ty, even if such dam-age or loss is due to the fault or neglect of the Own-er or any-one for whom the Own-er is respon-si-ble. The Con-trac-tor is oblig-at-ed to include, or cause to be includ-ed, pro-vi-sions sim-i-lar to this para-graph in all of the Con-trac-tor's sub-con-tracts and its sub-con-trac-tor's con-tracts with their sub-subcontractors. The Con-trac-tor's deductibles/-self-insur-ance reten-tion's must be dis-closed to Own-er and are sub-ject to Own-er's approval. The Con-trac-tor is respon-si-ble of the amount of any deductible or self-insured reten-tion. Any deductible or reten-tion applic-a-ble to any claim or loss shall be the respon-si-bil-i-ty of Con-trac-tor and shall not be greater than $25,000, unless oth-er-wise agreed to, in writ-ing, by Owner. Insur-ance required of the Con-trac-tor or any oth-er insur-ance of the Con-trac-tor shall be con-sid-ered pri-ma-ry, and insur-ance of Own-er shall be con-sid-ered excess, as may be applic-a-ble to claims or loss-es which arise out of or relate to the Work or this Project. A. Work-ers' Com-pen-sa-tion and Employ-ers' Lia-bil-i-ty Insur-ance Cov-er-age: The Con-trac-tor shall pur-chase and main-tain work-ers' com-pen-sa-tion and employ-ers' lia-bil-i-ty insur-ance for all employ-ees engaged in the Work, in accor-dance with the laws of the State of Flori-da. Lim-its of cov-er-age shall not be less than: $500,000 Lim-it Each Accident $500,000 Lim-it Dis-ease Aggregate $250,000 Lim-it Dis-ease Each Employee B. Com-mer-cial Gen-er-al Lia-bil-i-ty Cov-er-age: Con-trac-tor shall pur-chase and main-tain com-mer-cial gen-er-al lia-bil-i-ty insur-ance on a full occur-rence form. Cov-er-age shall include, but not be lim-it-ed to, Premis-es and Oper-a-tions, Per-son-al Injury, Con-trac-tu-al for this Con-tract, Inde-pen-dent Con-trac-tors, Broad Form Prop-er-ty Dam-age, Prod-ucts and Com-plet-ed Oper-a-tion Lia-bil-i-ty Coverage(s) and shall not exclude cov-er-age for the "X" (Explo-sion), "C" (Col-lapse) and "U" (Under-ground) Prop-er-ty Dam-age Lia-bil-i-ty expo-sures. Lim-its of cov-er-age shall not be less than: $ 1,000,000 Com-bined Sin-gle Lim-it Each Occurrence $ 2,000,000 Aggre-gate Limit Con-trac-tor shall add Own-er as an addi-tion-al insured through the use of Insur-ance Ser-vice Office Endorse-ments No. CG 20.20 .22.85 word-ing or equiv-a-lent, or broad-er, an exe-cut-ed copy of which shall be attached to or incor-po-rat-ed by ref-er-ence on the Cer-tifi-cate of Insur-ance to be pro-vid-ed by Con-trac-tor pur-suant to the require-ments of the Project Documents. C. Busi-ness Auto-mo-bile Lia-bil-i-ty Cov-er-age: The Con-trac-tor shall pur-chase and main-tain Busi-ness Auto-mo-bile Lia-bil-i-ty Insur-ance as to own-er-ship, main-te-nance, use, load-ing and unload-ing of all of Con-trac-tor's owned, non-owned, leased, rent-ed or hired vehi-cles with lim-its not less than: $1,000,000 Com-bined Sin-gle Lim-it Each Accident D. Excess or Umbrel-la Lia-bil-i-ty Cov-er-age: Con-trac-tor shall pur-chase and main-tain Excess Umbrel-la Lia-bil-i-ty Insur-ance or Excess Lia-bil-i-ty Insur-ance on a full occur-rence form pro-vid-ing the same con-tin-u-ous coverage(s) as required for the under-ly-ing Com-mer-cial Gen-er-al, Busi-ness Auto-mo-bile and Employ-ers' Lia-bil-i-ty Coverage(s) with no gaps in con-ti-nu-ity of coverage(s) or lim-its with Own-er added by endorse-ment to the pol-i-cy as an addi-tion-al insured in the same man-ner as is required under the pri-ma-ry poli-cies, and shall not be less than: $4,000,000 Each Occurrence/Accident
Post-Bid
Transportation Terminals
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 8, 2022
March 8, 2022
Multiple Locations, Panama City Beach, FL
Related To This Project
Panama City Beach, FL
--
Panama City Beach, FL
Bid Date: Mar 18 2022
Panama City Beach, FL
--
Panama City Beach, FL
Bid Date: Mar 14 2022
Panama City Beach, FL
Bid Date: Mar 08 2022
Panama City Beach, FL
Bid Date: Jan 31 2022
Panama City Beach, FL
--
Panama City Beach, FL
Bid Date: Mar 24 2022
Panama City Beach, FL
Bid Date: Feb 08 2022
Panama City Beach, FL
Bid Date: Jan 07 2022
Panama City Beach, FL
Bid Date: Jan 26 2022
Panama City Beach, FL
Bid Date: Oct 01 2021
Panama City Beach, FL
Bid Date: Jan 18 2022
Panama City Beach, FL
Bid Date: Dec 22 2021
Panama City Beach, FL
Bid Date: Jan 06 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.