Site work and paving for a water / sewer project in Anadarko, Oklahoma. Completed plans call for site work for a water / sewer project; and for paving for a water / sewer project.

Provide material equipment & labor to install Eco Make Up Air Power Vent with all appurtenances including electrical as shown in plans. Install #9400 automatic flushing devices as shown in plans. Install 8" drainage pipe w/ nyloplast drain basins as shown in plans. Concrete paving cut & repair. Fencing. The envelope(s) containing the bid(s) must be sealed, addressed to the ANADARKO PUBLIC WORKS AUTHORITY and designated as Bid for DISINFECTION BY-PRODUCT REDUCTION (2021). The Owner may consider informal any bid not prepared and submitted in accordance with the provisions hereof and may waive any informalities or reject any and all bids. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. No bidder may withdraw a bid within 60 days after the actual date of the opening thereof. Bids will not be accepted by the owner more than 72 hours prior to the scheduled bid opening. 2. Preparation of Bid THE FOLLOWING FORMS SHALL BE INCLUDED WITH THE BID: BID PROPOSAL, BUSINESS RELATIONSHIP AFFIDAVIT, BID BOND, NON COLLUSION AFFIDAVIT, PAYROLL AFFIDAVIT AND CERTIFICATE AS TO CORPORATE PRINCIPAL. ANY BID SUBMITTED WITHOUT ALL FORMS COMPLETED WILL BE REJECTED. Each bid must be submitted in a sealed envelope, bearing on the outside, the name of the bidder, his address, and the name of the project for which the bid is submitted. If forwarded by mail, the sealed envelope containing the bid must be enclosed in another envelope addressed as specified in the bid form. A Conditional or qualified Bid will not be accepted. 3. Subcontracts The bidder is specifically advised that any person, firm, or other party to whom it is proposed to award a subcontract under this contract shall be subject to acceptance by the Owner. Approval of the proposed subcontract award will not be given by the Owner unless and until the proposed subcontractor has submitted certifications and/or other evidence required by the Owner attesting to the subcontractors qualifications. 4. Telegraphic Modification Any bidder may modify his bid by telegraphic communication at any time prior to the scheduled closing time for receipt of bids, provided such telegraphic communication is8 received by the Owner prior to the closing time, and provided further the Owner is satisfied that a written confirmation of the telegraphic modification over the signature of the bidder was mailed prior to the closing time. The telegraphic communication should not reveal the bid price but should provide the addition or subtraction or other modification so that the final prices or terms will not be known by the Owner until the sealed bid is opened. If written confirmation is not received within two days from the closing time, no consideration will be given to the telegraphic modification. 5. Method Bidding The Owner invites the following bid(s) for the DISINFECTION BY-PRODUCT REDUCTION (2021). 6. Qualification of Bidder The Owner may make such investigations as he deems necessary to determine the ability of the bidder to perform the work, and the bidder shall furnish to the Owner all such information and data for this purpose as the Owner may request. The Owner reserves the right to reject any bid if the evidence submitted by, or investigation of such bidder fails to satisfy the Owner that such bidder is properly qualified to carry out the obligations of the contract and to complete the work contemplated therein. Conditional bids will not be accepted. Tied bids are non-restrictive: In order for a tied bid proposal to be accepted, it must be lower than the sum of low separate bids. 7. Bid Security Each bid must be accompanied by cash, certified check of the bidder, or a bond prepared on the form of bid bond attached hereto, duly executed by the bidder as principal and having as surety thereon a surety company approved by the Owner, in the amount not less than 5% of the bid. Such cash, check or bid bond will be returned, if requested, to all except the three lowest bidders within three days after the opening of bids, and the remaining cash, check or bid bond will be returned, if requested, promptly after the Owner and the accepted bidder have executed the contract, or if no award has been made within 30 days after the date of the opening of bids, upon demand of the bidder at any time thereafter, as long as he has not been notified of the acceptance of his bid. 8. Liquidated Damages for Failure to Enter into Contract The successful bidder, upon his failure or refusal to execute and deliver the contract and bonds required within 10 days after he has received notice of the acceptance of his bid, shall forfeit to the Owner, as liquidated damages for such failure or refusal, the security deposit with his bid.9 9. Time of Completion and Liquidation Damages Owner has 10 days to return an executed copy of the agreement after its receipt from the contractor. Owner has 10 days to issue a Notice to Proceed after the Owner executes the agreement. Bidder must agree to commence work on or before a date to be specified in a written "Notice to Proceed" of the Owner and to fully complete the work within 90 consecutive calendar days thereafter. Bidder must agree also to pay as liquidated damages, the sum of $600.00 for each consecutive calendar day thereafter as hereinafter provided in the General Conditions. In the event of a conflict between the specifications and the DWSRF Supplemental Conditions (DW-185 "Pink Sheets"), the latter shall govern. 10. Condition of Work Each bidder must inform himself fully of the conditions relating to the construction of the project and the employment of labor thereon. Failure to do so will not relieve a successful bidder of this obligation to furnish all material and labor necessary to carry out the provisions of his contract. Insofar as possible the contractor, in carrying out his work, must employ such methods or means as will not cause any interruption of or interference with the work of any other contractor. Any item required to complete the project to have a complete functional facility or required by the specifications for which bid items are not set up shall be included in other bid items. All applicable laws, ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the contract throughout. 11. Addenda and Interpretations No interpretations of the meaning of the plans, specifications or other pre-bid documents will be made to any bidder orally. Every request for such interpretation should be in writing and addressed to: WDB ENGINEERING P.L.L.C. 6330 S.E. 74TH Street, Oklahoma City, OK 73135 and to be given consideration must be received at least five days prior to the date fixed for the opening of bids. Any and all such interpretations and any supplemental instruction will be in the form of written addenda to the specifications which, if issued, will be mailed by certified mail with return receipt requested to all prospective bidders (at the respective address furnished for such purposes), not later than three days prior to the date fixed for the opening of bids. Failure of any bidder to receive any such addendum or interpretation10 shall not relieve such bidder from any obligation under his bid as submitted. All addenda so issued shall become part of the contract documents. 12. Conflict Statements In the event of a conflict between the specifications and the DWSRF Supplemental Conditions (DW-185 "Pink Sheets"), the latter shall govern. In the event of a conflict between the plans and specifications, the specifications shall govern. 13. Security for Faithful Performance Simultaneously with his delivery of the executed contract, the Contractor shall furnish a Performance Bond, Statutory Bond and Maintenance Bond or Bonds, each in the amount of 100% of the contract price, as security for faithful performance of this contract and for the payment of all persons performing labor on the project under this contract and furnishing materials in connection with this contract, as specified in the General Conditions included herein. The surety on such bond or bonds shall be a duly authorized surety company satisfactory to the Owner. The maintenance bond shall occur within a period of one (1) year after acceptance of said project. 14. Power of Attorney Attorneys-in-fact who sign bid bonds or contract bonds must file with each bond a certified and effectively dated copy of their power of attorney. 15. Notice of Special Conditions Attention is particularly called to those parts of the contract documents and specifications which deal with the following: a. Inspection and testing of materials b. Insurance requirements c. Stated allowances d. Time of completion 16. Laws and Regulations The bidder's attention is directed to the fact that all applicable Federal or State laws, municipal ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the contract throughout, and they will be deemed to be included in the contract the same as though herein written out in full. 17. Method of Award - Lowest Qualified Bidder If at the time this contract is to be awarded, the lowest base bid submitted by a responsible11 bidder does not exceed the amount of funds, then estimated by the Owner as available to finance the contract, the contract will be awarded on the base bid only. If such bid exceeds such amount, the Owner may reject all bids or may award the contract on the base bid combined with such deductible alternates applied in numerical order in which they are listed in the Form of Bid, as produces a net amount which is within the available funds. 18. Obligation of Bidder At the time of the opening of bids, each bidder will be presumed to have inspected the site and to have read and to be thoroughly familiar with the plans and contract documents (including all addenda). The failure or omission of any bidder to examine any form, instrument or document shall in no way relieve any bidder from any obligation in respect of his bid. 19. INSPECTION TRIPS If requested by any of the bidders an inspection trip may be coordinated with the ANADARKO PUBLIC WORKS AUTHORITY, 501 W. Virginia, Anadarko, OK 73005. The ENGINEER is WDB ENGINEERING P.L.L.C.. and whose ADDRESS is 6330 S.E. 74Th Street, Oklahoma City, OK 73135. 20. SCOPE OF CONTRACT: The contract consists of furnishing and installing all material and equipment for a DISINFECTION BY-PRODUCT REDUCTION (2021) as shown in the plans and specifications. 21. Davis Bacon Act This project is subject to the Davis Bacon Act and prevailing Wage rate requirements. 22. System for Award Management (SAM) System for Award Management (SAM) registration is required for all DWSRF program applicants and Awardees (Entities, prime contractors, subcontractors, vendors) in order to be awarded contracts by the DWSRF program. SAM replaces Central Contractor Registration/Federal Agency Registration, Online Representations and Certifications Application, and Excluded Parties List System. Applicants and awardees are required to complete a one-time free registration to provide basic information relevant to procurement and financial transactions. New Applicants and awardees please go to Sam.gov to complete the registration process. Note: In order to register in SAM, a Data Universal Number System (DUNS) number will be12 required. DUNS number is a unique, non-indicative 9-digit identifier issued and maintained by Dun & Bradstreet (D&B) that verifies the existence of a business entity globally. D&B assigns DUNS numbers for each physical location of a business. All entities doing business with the U.S. Government can receive a DUNS number FREE of charge and, under normal circumstances, within 1-2 business days when using the D&B web form process at http://fedgov.dnb.com/webform 23. American Iron & Steel American Iron and Steel provisions also apply to projects funded directly by or assisted in whole or in part by and through the Federal Government pursuant to the "Consolidated Appropriations Act, 2014". Sec. 436(a)(1) of the act states that "None of the funds made available by a State Water Pollution Control Revolving Fund as authorized by title VI of the Federal Water Pollution Control Act (33 U.S.C 1381 et seq.) or made available by a Drinking Water Treatment Revolving Loan Fund as authorized by Section 1452 of the Safe Drinking Water Act (42 U.S.C. 300j-12) shall be used for a project for the construction, alteration, maintenance, or repair of a public water system or treatment works unless all of the iron and steel products used in the project are produced in the United States.

Post-Bid

Water / Sewer

$630,000.00

Public - City

Paving, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
24
Bidding Soon
382
All Active Projects
167
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2022

March 2, 2022

img_map_placeholder

Multiple Locations, Anadarko, OK

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.