BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in Topeka, Kansas. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Concrete surface repair on the bridge pier and pre-stressed concrete girder. The project also requires a small area of asphalt pavement to be repaired. Any questions or concerns can be directed to Laramie Turner at (785) 274-3651, or by email, lturner@ksturnpike.com. Proposals must be accompanied by a bid bond in the amount of 5 percent of bid and made payable to the Kansas Turnpike Authority as guarantee that the bidder will enter into a contract and give a performance bond as required if awarded the contract. The award of each contract shall be in accordance with the provisions of the Standard Specifications of the Kansas Department of Transportation, edition of 2015, and will be based upon the summation of the products of the unit prices and the approximate quantities. The Authority reserves the right to reject any or all bids and to waive any irregularity therein, to determine which is the lowest responsible bid most suitable to the Authority. Concrete surface repair on the bridge pier and pre-stressed concrete girder. The project also requires a small area of asphalt pavement to be repaired. Any questions or concerns can be directed to Laramie Turner at (785) 274-3651, or by email, lturner@ksturnpike.com. Proposals must be accompanied by a bid bond in the amount of 5 percent of bid and made payable to the Kansas Turnpike Authority as guarantee that the bidder will enter into a contract and give a performance bond as required if awarded the contract. The award of each contract shall be in accordance with the provisions of the Standard Specifications of the Kansas Department of Transportation, edition of 2015, and will be based upon the summation of the products of the unit prices and the approximate quantities. The Authority reserves the right to reject any or all bids and to waive any irregularity therein, to determine which is the lowest responsible bid most suitable to the Authority. Br. No. 187.88 The primary operation to be undertaken with this project (KTA Contract No. 7883) consists of concrete surface repair on the bridge pier and pre-stressed concrete girder. The project also requires a small area of asphalt pavement to be repaired. The project is located in Shawnee County, Kanas

Bid Results

Bridges / Tunnels

$98,006.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
41
Bidding Soon
694
All Active Projects
295
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2022

March 14, 2022

img_map_placeholder

Multiple Locations, Topeka, KS

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.