BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 16, 2024 at 7:00 PM

Updated December 17, 2024

Renovation of an elderly care / assisted living facility in Phelps, New York. Completed plans call for the renovation of a elderly care / assisted living facility.

The Finger Lakes DDSO is soliciting bids for a Bathroom Renovation at our Route 488 IRA located at 1505 Route 488, Phelps, NY 14532. This is a NYS public works project, and prevailing wages must be paid. Contract term: 30 days after completion of project Any questions not asked at the site visit must be submitted in writing to FL.Purchasing@opwdd.ny.gov within 2 business of the site visit. Contractors will receive a response within 2 business days after the deadline for submitting questions. All questions and answers will be e-mailed to all contractors that attended the mandatory site visit. The purpose of asking questions during the site visit is to obtain clarification to the enclosed Project Scope. In the event that modifications are needed to the Project Scope, the modifications will be distributed by the FLDDSO Business Office to all contractors. Contractors are to prepare and submit their quotes based on the written Project Scope and any modifications made in writing. This portion MUST be completed, signed and returned via email or fax to the contact listed on the cover sheet of this RFQ. SCOPE OF WORK includes, but is not necessarily limited to the following: 1) Follow the Design provided. 2) Be prepared with the necessary materials. Solid surface materials take time to be acquired as well as many other finishes do. Continuity of work is important. The project will be worked on continuously from demolition to finish. Have your materials in hand. 3) The location of the project dumpster will be approved by the house director. 4) Demolish the existing bathroom including removing the wallboard, door slab and subfloor taking care to salvage the door frame and fire alarm/strobe. 5) Install the floor drains and necessary plumbing rough in. 6) An inspection of the job is required at this point. Schedule this with the point of contact. 7) Once approved, install the subfloor according to the design. It should generally pitch to the drains. The maximum differential between the hallway flooring and the finished bathroom floor is 1/2 inch. 8) The epoxy flooring system is outlined in the design and will be installed by an installer with 5 years of experience verified by the manufacturer of the resinous material. 9) Install the bathroom according to the design making sure to update the project manager with any pertinent information relating to the job including unforeseen circumstances and changes to the design. 10)Schedule a final inspection

Bid Results

Elderly Care / Assisted Living

$47,750.00

Public - State/Provincial

Renovation

6

3

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
246
Active Projects
158
Bidding Soon
1,546
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2024

January 6, 2025

Project location map

1505 NY-488, Phelps, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.